Laserfiche WebLink
EXISTING OBSERVATION/ V <br />MONITORING a�NFLL <br />- TYPICAL OF (2) <br />EXISTING TANK SLAB <br />EXISTING ESO <br />Al <br />EXISTING 3'FRP <br />EXIST ING DUAL TURBINE <br />v <br />TANK #1 <br />(87 OCTANE) <br />20.000 GALLON <br />310 DISPENSER <br />EXISTING FILL.. VENT. <br />STAGE IAND <br />11 VAPOR 3 �C4 <br />RETURN <br />TYPICAL VR 'y -------- --- . ...... <br />3+0 DISPENSER <br />7 <br />�C4-'ACZI-V <br />- 2 <br />-7 --77r-- 117771-7�_ <br />EXISTING ANNULAR RR D R <br />D D <br />SPACE SENSOR p %p p <br />TYPICAL OF (2) <br />VR' <br />E <br />VIR <br />2 1 <br />6 TANK #2 <br />2 <br />DIESEL) VR VIR VR <br />10,000 GALLON <br />EXISTING 1-1/2" EXISTING 1-1/2" EXISTING 1-1i2" <br />4 1 INSIDE 4" INSIDE 4INSIDE 4' <br />EXISTING SINGLE EXISTING 2" FRP EXISTING 2"FRP EXISTING 2" FRP <br />TURBINE <br />VR <br />RR R <br />TANK#3 - ------ D p Cl <br />p <br />�91 OCTANE) <br />3+1 DISPENSER <br />10,000 GALLON <br />EXISTING LEVEL. GA4UGE VR <br />TYPICAL OF (3) _4 EXISTING <br />X <br />FRP _/ , I , 3 RT� <br />EXISTING 3" F SLING 3'' ERR 1 3" FRP EXISTING 3" F <br />34 0 1,, ISFENSER <br />-T <br />EXISTING SINGLE <br />TURBINE <br />;7 7 <br />c','-47— <br />34.0 DISPENSER <br />�G4-1 t 4-1 4 <br />R <br />p D <br />VER <br />FEXISTING 1-1/2" <br />INSIDE 4' <br />EXISTING 3"FRP <br />R <br />3+1 DISPENSER <br />4 <br />4 <br />5 7 <br />(C41� C4-1/ <br />NOTES <br />1, CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN <br />INTENT AND THE CONTRACTOR IS PERMITTED TO ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD <br />CONDITIONS AND INSTALLATION TECHNIQUES. <br />2. SUPPLY, RETLJRN AND VENT PIPING IS TO SLOPE TOWARD -DANK 1,8" PER FOOT MINIMUM. 1'4" PER FOOT <br />PREFERRED. SIPHON PIPING TO SLOPE 14' PER FOOT. <br />3, SECONDARY CONTAINMENT PIPING 13 SHO'AN BY NOTE ONLY, NOT GRAPHICAIJ Y. ALL PRODUCT PIPING <br />TO BE DOUBLE CONTAINMENT PIPE ROUTED IN TERTIARY CONTAINMENT IDUCT ALL VENTAND VAPOR <br />PIPING TO BE DOUBI E'hAll FRP PIPING. <br />INSTALLATION NOTES <br />1 INSTAL_L 12" SINGLEV,'ALIL FIBERGLASS PIPE JO VENT BACK. SLOPE NEW PIPING t8" PER FT MIN, <br />BACK DOWN TO POINT OF INTERCEPTION. PERFORM ALL NECESSARY INTEGRITY"TESTING ON NE'A/ <br />VENT PIPING. BACKFILL PIPE TRENCH AND REPAIR AFFECTED LANDSCAPING TO MATCH EXISTING <br />CONDITION. REPAIR ALL A.C. PAVING -TO MATCH EXISTING, AND RES7RIPE ALLAFFEC.TED AREAS <br />C1 <br />AP CONTRACTOR TO INSTALL (1) NEW 2" BUCK IRON RISER PIPE WITH RAIN CAP FOR DIESEL MOUNT I <br />RISER PIPE TO NEW VENT BACK ASSEMBLY, <br />... .. . .. .. . <br />3 . INSTALL NEW DRESSER 'A"AYNE BLENDING CONVERSION KIT ON (6) EXISTING 3,V390D DISPENSERS. <br />DISPENSERS ALREADY FITTED *'ITI-I HEALY ORVR VAPOR PUMPS, ELECTRICAL KIT. VAPOR KIT HOSES, <br />NOZZLES, BREAKAWAY VALVES AND VEEDER-ROOT ISD MONITORING DEVICES EXISTING <br />CONTAINMENT SUMPS AND SENSORS TO REMAIN. START UP BYMANLJFACTURERS CERTIFIED <br />TECHNICIAN GENERAL CONTRACTOR TO PURGE LINESVOTI-I A MINIMUM OF 200 GALLONS THROUGH <br />EACH HOSE NOZZLE. ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR <br />INCORRECT WIRING THAT DESTROYS El.-E(TR(.)Nl(.,SA/IL.L- BE BILLED BACK TO THE CONTRACTOR. <br />AFTER PURGING THE PRODUCT I.-INES OF AIR AND BEFORE THE TESTING. CONTRACTOR TO PERFORM <br />ALL REQLARED VAPOR RECOVERY TESTING PER CARR E.O. VR -202 AND LOC "ll- AIR POLLUTION <br />CONTROL AUTHORITY AND FORWARD RESULTS TO OWNER AND TO JURISDICTION AS SPECIFIED IN THE <br />PERMIT CONDITIONS. <br />4 INSTALL (4)DlAYNE VISTA SERIES V595, DUAL HOSE PER SIDE PRODUCT DISPENSERS\A'ITH <br />DIESEL ON EXISTING ISLANDS. NEV'JDISPENSER TO BE FITTEDA'ITH HEALY VP1000 VAPOR PUMPS AND <br />VEEDER-ROOT ISD MONITORING DEVICES. REINSTALL HEALY EVR I-IOSES, NOZZLES AND BREAKAA?AY <br />VALVES EXISTING CONTAINMENT SUMPS AND SENSORS TO REMAIN. START UP BY MANUFACTURERS <br />CERTIFIED TECHNICIAN. GENERAL CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS <br />THROUGH EACH HOSE NOZZLE. ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER <br />INSTALLATION OR INCORRECT'A/IRING THAT [DESTROYS ELECT RON CSVOLL BE BILLED BACK TO THE <br />CONTRACTOR. AFTER PURGING THE PRODUCT LINES OF A'IR AND BEFORE -TS <br />THE ETING. CONTRACTOR <br />TO PERFORM ALL REQUIRED VAPOR RECOVERY TESTING PER CARE E.O.VR-202 AND LOCAL AIR <br />POLLUTION CONTROL AUTHORITY AND FORA/ARD RESULTS TO OWNER AND TO JURISDICTION AS <br />SPECIFIED IN THE PERMIT CONDITIONS. <br />5 CONTRACTOR -TO INSTALL NEW ATG FLOAT KIT FOR DIESEL FUEL AT 10.000 GAI LON [DIESEL <br />COMPARTMENT. <br />6 IRE -LABEL FORMER TANK FOR DIESEL USE, PER LATEST API AND SAFEWAY STANDARD <br />DlCj,AL <br />DIAL TOLL FREE <br />1-800-227-2600 <br />AT LEASTTV\10 DAYS <br />BEFORE YOU DIG <br />UNDERGROUND SERVICE ALERT OF CALIFORNIA <br />RO/,51640 j'r+ <br />IV <br />C <br />REVISIONS <br />RESPONSE TO COMMENTS <br />AUGUST 21,2009 <br />7\ <br />SUBIJITTAL <br />DATES <br />OWNER: <br />01/28/09 <br />FREG. AGENCIES <br />01/28/09 <br />0. T, B.: <br />01/02/09 <br />PROJECT N0. <br />08-41 <br />5 (D <br />C) <br />(6 <br />< <br />co Lc) <br />ui C) <br />W <br />0 <br />Z <br />01-1 <br />o <br />LL <br />w <br />w <br />W <br />cf) <br />0 <br />CD <br />ai <br />0 <br />E <br />S 2, <br />Lr) <br />CD as <br />T_ 0 <br />110 <br />OD <br />REVISIONS <br />RESPONSE TO COMMENTS <br />AUGUST 21,2009 <br />7\ <br />SUBIJITTAL <br />DATES <br />OWNER: <br />01/28/09 <br />FREG. AGENCIES <br />01/28/09 <br />0. T, B.: <br />01/02/09 <br />PROJECT N0. <br />08-41 <br />5 (D <br />C) <br />(6 <br />< <br />W <br />0 <br />Z <br />01-1 <br />o <br />LL <br />w <br />w <br />W <br />cf) <br />0 <br />CD <br />U) <br />S 1-1 E E T TITLE <br />