Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br />SECONDARY CONTAINMENT TESTING REPORT FORM (Page t of 6) <br />Type of Action ❑ Installation Test ❑ Repair Test m Six Month Test 36 Month Test <br />I. FACILITY INFORMATION <br />CERS ID <br />10156819 <br />I Date of Secondary Conta nt Test <br />11/7/2018 <br />Business Name (Same as Facilely Name or DBA -Doing Business As) <br />Safeway 2600 <br />Business Site Address <br />1987 W. 11th St. <br />City <br />Tracy <br />ZIP Code <br />95376 <br />IL UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br />Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification) <br />Michael McCarter <br />Phone # <br />(707) 545-5522 <br />Contractor / Tank Tester License # <br />Able Maintenance, Inc. -312844 <br />ICC Certification 0 <br />8819839 <br />ICC Certification Expiration Date <br />10/25/2019 <br />III. SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br />TANK ID: (Bytank number, storedproduct etc.) <br />A 87 <br />B 91 <br />C Diesel D <br />Tank Containment <br />Tightness Test Result <br />❑ Pass ❑ Fail m NA <br />❑ Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail 0 NA D Pass ❑ Fail ❑ NA <br />Product Piping Containment <br />Tightness Test Result <br />❑ Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail 0 NA D Pass D Fail D NA <br />Communication Test Result <br />D Pass ❑ Fail 0 NA <br />D Pass ❑ Fail m NA <br />❑ Pass ❑ Fail 0 NA ❑ Pass ❑ Fail ❑ NA <br />Remote Fill Piping Containment <br />Tightness Test Result <br />❑ Pass ❑ Fail 0 NA <br />D Pass ❑ Fail <a NA <br />❑ Pass ❑ Fail m NA D Pass ❑ Fail ❑ NA <br />Communication Test Result <br />D Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail m NA ❑ Pass ❑ Fail ❑ NA <br />Vent Piping Containment <br />Tightness Test Result <br />D Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail m NA <br />D Pass ❑ Fail 0 NA D Pass ❑ Fail ❑ NA <br />Communication Test Result <br />❑ Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail m NA <br />D Pass ❑ Fail 0 NA D Pass ❑ Fail ❑ NA <br />Vapor Recovery Piping Containment <br />Tightness Test Result <br />❑ Pass ❑ Fail 0 NA <br />D Pass ❑ Fail 0 NA <br />D Pass D Fail 0 NA D Pass D Fail ❑ NA <br />Communication Test Result <br />❑ Pass ❑ Fail 0 NA <br />D Pass D Fail 0 NA <br />D Pass D Fail 0 NA D Pass D Fail ❑ NA <br />Turbine I Product Piping Sump <br />Tightness Test Result <br />❑ Pass ❑ Fail 0 NA <br />D Pass ❑ Fail 0 NA <br />D Pass ❑ Fail 0 NA ❑ Pass ❑ Fail ❑ NA <br />Fill Riser Sump <br />Tightness Test Result <br />D Pass D Fail 0 NA <br />D Pass D Fail 0 NA <br />D Pass ❑ Fail 0 NA D Pass ❑ Fail ❑ NA <br />VENT I TRANSITION SUMP ID: <br />a <br />b <br />C d <br />Tightness Test Result <br />D Pass ❑ Fail 0 NA <br />D Pass D Fail 0 NA <br />D Pass D Fail 0 NA D Pass D Fail D NA <br />UDC ID: <br />17-8 <br />213-14 <br />3 4 <br />Tightness Test Result <br />0 Pass ❑ Fail D NA <br />0 Pass D Fail ❑ NA <br />D Pass ❑ Fail D NA D Pass D Fail D NA <br />UDC ID: <br />5 <br />6 <br />7 8 <br />Tightness Test Result <br />❑ Pass ❑ Fail D NA <br />D Pass ❑ Fail ❑ NA <br />D Pass ❑ Fail D NA 1 D Pass ❑ Fail ❑ NA <br />UDC ID: <br />9 <br />1 10 <br />11 1 12 <br />Tightness Test Result <br />❑ Pass ❑ Fail D NA <br />D Pass D Fail ❑ NA <br />D Pass ❑ Fail ❑ NA 1 D Pass D Fail ❑ NA <br />All items marked "Fail" or "NA" must be explained in their respective "COMMENTS" section. <br />IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br />I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, Title 23, Division <br />3, Chapter 16, Section 2637 and all the information contained herein is accurate. <br />UST Service Technician Signature <br />CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Counul, NA = Not Applirable, UDC = Under- <br />Dspenser Containment <br />