|
e Maintenance History Service Station Systems
<br /> 680 Quinn Ave.
<br /> Shell 135997 San Jose, CA 95112
<br /> � gBIE
<br /> 1455 The Alameda @ Hester in San Jose License#: 485184
<br /> 8114114 to 11/14114
<br /> Job# Release Ref# Finished Tech Hold Status Tasks
<br /> 8/18114 Dlog: per Scott Owen on 03/16/12.No AQ permit required for Nozzle
<br /> 695936 Ethan Lim 8128/14 DebbieW Invoiced Designated Operator Insp,Compliance,Passed Verification;
<br /> 'Billing: 10/14/14 SEP:Work order#1365153 to April.
<br /> 689294 Need ! ! Void Disp#01,Meter-ISD Vpr Flow,Warn-Degrd Collect, [H1 FP1 Blend 3];
<br /> Billing:6/17114 BFL:Voided:cancelled by solvone. Vapor to Liquid Test,Verification,;
<br /> Nozzle Bag Test,Verification,;
<br /> VP-1000 Vac Motor Test,Verification,;
<br /> Flow Rate,Verification,;
<br /> 673126 Ethan / / Void Sensor-ISD Pressure,Wam-Gross PSI,Cleared Alarm(Winter Fuel)[2!5 10:OOam];
<br /> Billing:2/6114 JIT:Voided:wintre fuel
<br /> 670894 Ethan / / Void Sensor-ISD Pressure,Warn-Gross PSI,Cleared Alarm(Winter Fuel)[1121 10:OOamj;
<br /> Billing: 1/22/14 JIT:Voided:winter fuel
<br /> 669972 Ethan / i Void Mon#01,Power Supply,Dead/No Power, [back-up battery needed);
<br /> •Dispatch: 1/15/14 O?E:Scheduled for Sean to do on Thursday 1/16 Sensor-ISD Pressure,Warn-Gross PSI, [1114 10:00am];
<br /> •Billing: 1/16114 O?E:Voided:Ethan cancelled request no longer needs parts.
<br /> The gross psi self cleared
<br /> 669488 Need ! 1 Void Disp#02,Meter-ISD Vpr Flow,Warn-Degrd Collect, [1-12);
<br /> 'Dispatch: 1/15114 O?E:Scheduled for Sean to do on Thursday 1/16 Vapor to Liquid Test,Verification,;
<br /> Nozzle Bag Test,Verification,;
<br /> 1/10114 O?E:Ethan reports H2 degrade collect warn VP-1000 Vac Motor Test,Verification,;
<br /> 'Billing: 1/16/14 O?E:Voided:Ethan cancelled stating alarm self cleared
<br /> 668960 Need i / Void Sensor-ISD Pressure,Warn-Gross PSI,Cleared Alarm(Winter Fuel);
<br /> Billing: 1!7/14 JIT:Voided:winter fuel
<br /> 665687 Need / / Void Disp#03 Unihose,Operations,Stops Mid Sale, [disp 3141; M
<br /> 'Billing: 12/16/13 O?E:Voided:Ethan cancelled stating all is ok Z
<br /> 663192 Ethan 1 / Void Disp#04,Meter-ISD Vpr Flow,Warn-Degrd Collect, [1-141; C
<br /> Dispatch: 11/28113 O?E:Ethan reports Degrade Collect Warn on H4 today at Vapor to Liquid Test,Verification,: x
<br /> .
<br /> Gam Nozzle Bag Test,Verification,. 0
<br /> VP-1000 Vac Motor Test,Verification,; � _�
<br /> CS
<br /> I J sS
<br /> f11 C
<br /> 'Billing. 12/3/13 BFL:Voided:cancelled by ethan at site.states he never called/ +—+
<br /> requested this service. 04.
<br /> 662413 Need ! ! Void Sensor-ISD Pressure,Warn-Gross PSI. [11/22 6AMJ; ru „
<br /> "Billing: 11/22/13 JCP:Voided:alarm cleared(winter fuel) o
<br /> Fit
<br /> Printed by DebbieW at 11/14/14 2:05pm
<br /> Page
<br />
|