Laserfiche WebLink
j� <br /> I <br /> + UST SYSTEM DRAWING INFORMATION �L•S+ - «�( SNCL 1 <br /> 1. V Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. ✓ Plot plan to show location of tanks and all associated piping. <br /> 4. -( (. `j Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Tank cross-sectional diagram. <br /> 6. 4�5 Detail of tank, associated piping, excavation and cover. <br /> 7. �CJ Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> 8. CS Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. C5 Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. 4:n� At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br /> secondary (20) containment systems before covering. (Section 2635 (a) (3) & (4)] <br /> 11. CS Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK # # # # # # <br /> Imo. Z. <br /> CAPACITY <br /> kNopeEFLN <br /> MANUFACTURER <br /> COMPOSITION <br /> MODELS 1. <br /> PRODUCT 'Un� <br /> CORROSION PROTECTION 1` P <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% C> T�S <br /> METHANOL <br /> 13. TANK(s) TO 8E INSTALLED <br /> _ A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> 8. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-clad steel tank (Section 2635 (a) (2) (A)] <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> _ (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />