Laserfiche WebLink
Multiple tank installation will also require a 8.2 If tank must be ballasted during the backfill <br /> minimum of 12 inches between tank measured from procedure, at no time may the liquid exceed the <br /> each outside edge. height of the compacted backfill surrounding the <br /> tank. <br /> ANCHORING 8.3 The tank shall be encompassed by the proper �. <br /> 7.0 Certain situations require the use of properly backfill and extending to a minimum of 12 inches <br /> designed anchor straps to overcome existing over the top of the tank. <br /> buoyant forces.The straps are used in conjunction 8.4 Areas subject to heavy vehicular traffic shall have <br /> with a concrete holddown slab or deadman a protective cover of 18 inches clean, compacted <br /> anchors. soil with either 6 inches of reinforced concrete or 8 <br /> CAUTION. Use of steel cable or round inches of asphalt paving. If compacted soil is the <br /> bar is prohibited. only cover,it shall be a minimum of 36 inches <br /> deep. <br /> 8.5 Areas not subject to heavy vehicular traffic shall <br /> y., THE USE OF STEEL have a protective cover of a minimum 18 inches of <br /> CAME HolAND <br /> oowN"s°Asa s clean compacted soil covered by 4 inches of <br /> IS PROHIBITED reinforced concrete or 6 inches of asphalt paving. If <br /> compacted soil is the only cover,it shall be a <br /> minimum of 24 inches deep. <br /> 8.6 Finishing Instructions; A fiberglassing kit is <br /> shipped with tank and provides materials to cover <br /> unused openings and external attachments, such <br /> as lifting lugs.all finishing work will be done <br /> 7.1 A pad of inert,insulating, dielectric material must prior to backfilling. <br /> be used to separate the anchor strap from the 9.0 For Glasteel II warranty to be initiated,the <br /> tank. Installation Checklist must be properly filled out <br /> by the customer, and returned to the Modern <br /> BACK-FILL Welding Co. subsidiary from which the tank was <br /> 8.0 Only the following approved backfill material may fabricated. The Installation Checklist must be <br /> be used. returned within 30 days after date of installation.If the <br /> 1. Clean washed sand. Glasteel H tank has not been installed within 90 days <br /> 2.Pea Gravel- (particle size must be not less than of delivery from the manufacturer,it is required that the <br /> 1/8 inch or more than 3/4 inch) tank be re-certified by the manufacturer, at the owner's( <br /> 3.Washed stone or gravel crushings- expense,prior to installation. <br /> (angular particle size required to be not less <br /> than 1/8 inch or more than 1/2 inch) MAINTENANCE <br /> 10.0 Maintenance•of Underground Storage Tanks <br /> Theprimary tank should be inspected monthly for the <br /> s Pea CniahYd,.. <br /> z- _ ;:, resents of water. Inspections should take lace at the <br /> 1 ,,,.� cask � ;w< . P sP P <br /> lowest possible points inside the primary tank.Remove <br /> 6 any water f=ound. Water and sediment in fuel can cause <br /> ��,:. <br /> 2'' '••' plugging of filters.Also,bacterial growth originating from <br /> i the fuel,can cause filters to plug and corrosion of tanks <br /> •. { m and lines. A report by the US Department of Energy, <br /> _s BNL 48406,provides information on methods to test for <br /> 8.1 Special care should be used to ensure that the and remove water, test for bacterial presence in fuel,tank <br /> backfill is properly installed to evenly support the cleaning and fuel additives.Failure to remove water from <br /> bottom quadrant of the tank. the tank may void your warranty. <br /> NOTE: Do not backfill in layers using different <br /> SUBSIDIARIES NATIONWIDE: <br /> materials. <br /> Corporate Office (270) 585-4400 <br /> Finished grade <br /> Modern Welding Company of Owensboro, Inc (270)683-5323 <br /> Modern Welding Company of Ohio, Inc (740) 344-9425 <br /> typiaily 3 tc 4 R Modern Welding Company of Florida, Inc (407) 843-1270 <br /> Modern Welding Company of Texas,Inc (713) 675-4211 <br /> Modern Welding Company of Texas,Inc (817)636-2215 <br /> Modern Welding Company of Iowa,Inc (319)754-6577 <br /> Modern Welding Company of California, Inc (209).275-9353 <br /> Modern Welding Company of Georgia, Inc (706)722-3411 <br /> i:. Special <br /> plzcernece and <br /> rciWpacdw required <br />