My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2800 - Aboveground Petroleum Storage Program
>
PR0523352
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2024 12:59:14 PM
Creation date
3/1/2019 11:43:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0523352
PE
2832
FACILITY_ID
FA0010216
FACILITY_NAME
UNION PACIFIC RAILROAD - Intermodal Facility
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19820001
CURRENT_STATUS
01
SITE_LOCATION
1000 E ROTH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
FRuiz
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PR0523352\COMPLIANCE INFO.PDF
QuestysRecordID
2969447
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STI External Tank Inspection [_ <br /> UPRR French Camp <br /> Tank No.TNKD-0829 <br /> Antea Group Project No. UP03061T a ntea'g ro u p <br /> 2.5 INSPECTION INTERVAL <br /> NEXT FORMAL EXTERNAL INSPECTION (FEI) INTERVAL <br /> Formal external inspection interval as determined from STI SP001 standards shall not exceed 20 years. <br /> Formal external inspection due before 1/29/2039. <br /> NEXT FORMAL INTERNAL INSPECTION (FII) INTERVAL <br /> Due to the size and AST Category of the tank and the spill control, no Formal Internal Inspection interval was <br /> conducted in accordance with STI-SP001. <br /> 2.6 DEFINITIONS <br /> Continuous Release Detection Method (CRDM) - A means of detecting a release of liquid through <br /> inherent design. CRDM is passive because it does not require sensors or power to operate. Liquid releases are <br /> visually detected by facility operators.The system shall be designed in accordance with good engineering practice. <br /> Several acceptable and commonly used CRDM systems are as follows: <br /> • Release prevention barrier(RPB) (described in definition of release prevention barrier). <br /> • Secondary containment AST, including double-wall AST or double-bottom AST. <br /> • Elevated AST,with or without release prevention barrier. <br /> Release Prevention Barrier (RPB) - A liquid containment barrier that is installed under the AST. Its <br /> purpose is to divert leaks toward the perimeter of the AST where they can be easily detected,as well as to prevent <br /> liquid from contaminating the environment. RPBs are composed of materials compatible with the liquid stored in <br /> the AST and meet appropriate engineering standards. Examples are steel (as in steel double bottom tanks), <br /> concrete,elastomeric liners or other suitable materials, provided the above criteria are met. <br /> Category 1(AST)-The AST shall be repaired or replace if more than 3 square inches of any one square <br /> foot of the tank shell (i.e. approximately 2%) is found to be less than 50%of the original shell thickness or if the <br /> remaining shell thickness of an area is less than 25%of the original shell thickness at any point. <br /> XIINOGEN� <br /> 9 us_anteagroup.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.