Laserfiche WebLink
STI External Tank Inspection [_ <br /> UPRR French Camp <br /> Tank No.TNKD-0829 <br /> Antea Group Project No. UP03061T a ntea'g ro u p <br /> Certification <br /> I certify that I have conducted this tank inspection in accordance with STI SP001,Standard for the Inspection of <br /> Aboveground Storage Tanks.The findings contained herein represent Antea Group's professional opinions based <br /> upon the currently available information and are arrived at in accordance with currently acceptable professional <br /> standards.This document is based upon a specific scope of work requested by the client.The Contract between <br /> Antea Group and its client outlines the scope of work; only those tasks specifically authorized by that contract or <br /> outlined in this document will be performed.This document is intended only for the use of Antea Group's Client <br /> and anyone else specifically listed on this document.Antea Group will not and cannot be liable for unauthorized <br /> reliance by any other third party. Other than as contained in this paragraph,Antea Group makes no express or <br /> implied warranty as to the contents of this document. <br /> Date: January 31, 2019 <br /> Gary A. Diewald <br /> STI Inspector#STI AST-1755 <br /> Contact Information <br /> Antea Group <br /> 3855 Precision Drive,Suite 160 <br /> Loveland,CO 80538 <br /> 1 800 477 7411 <br /> XINOGEN� <br /> 12 us_anteagroup.com <br />