My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001496
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHANNEL
>
1634
>
3500 - Local Oversight Program
>
PR0544206
>
ARCHIVED REPORTS XR0001496
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 2:01:06 PM
Creation date
3/1/2019 1:42:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001496
RECORD_ID
PR0544206
PE
3528
FACILITY_ID
FA0005239
FACILITY_NAME
GOTELLI TRUCKING
STREET_NUMBER
1634
Direction
E
STREET_NAME
CHANNEL
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15304021
CURRENT_STATUS
02
SITE_LOCATION
1634 E CHANNEL ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 11 1 111 <br /> ECONOMICS <br /> Tables B and C show the system and The ABG system coupled -with the r y <br /> operational costa of the ABG system pigment filtration system coats <br /> currently in place at the ,fames River $1.9$/gallon, assuming capital cost is <br /> Corp, packaging plant in San Leandro, averaged over five years. Then costs <br /> California, The unit costs to Table B compare favorably over the much higher <br /> were calculated using a waste cost of hauling the waste to a disposal <br /> conversion rate of 1000 gallons per site The normal rate of return on <br /> month over a use period of five years investment for the ABO system is 7 to <br /> The cost per gallon is used most often 20 months. <br /> when comparing systems <br /> Table B. Capital Casts <br /> F <br /> SXstem <br /> gill Sm <br /> Advanced Bio-Gest UT-1000R $44,954 $0.73 <br /> (Rated at 1004 gal/month) <br /> Simpson 1 cu.ft.Fitter Press $10,000 $0.17 <br /> with pumps,tanks and plumbing <br /> Automatic pH Adjustment x+3,000 $0.05 <br /> Feed System <br /> 70TAL SYSTEM COST $57,950 <br /> Capital Cost Avemged over a 5 Year Per-,od, $0.97/gallon of waste <br /> F <br /> Table C. Operating Casts <br /> aMonst Carts C= <br /> Labor(7 hrs/Week) $20/hr $0.61 <br /> Electricity (4.43 KWH) $0.08/KW $0.26 <br /> PH Adjusting Chemic.uls <br /> Acetic Acid(90%) $5 44/gal $0.10 <br /> (Approx 1 ga1/55 gal waste) <br /> Ammonium Hydroxide(26%) $1.60/gal $0.03 <br /> (Approx. 1 gal/55 gal waste) <br /> _ DiB�sdon Mafia $20/cuff $0.01 <br /> 1!Z cu ft./month <br /> TOTAL OPERATING COSTS $1 01/ganon of waste <br />
The URL can be used to link to this page
Your browser does not support the video tag.