My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHANNEL
>
1649
>
3500 - Local Oversight Program
>
PR0544207
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 2:23:42 PM
Creation date
3/1/2019 1:47:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544207
PE
3528
FACILITY_ID
FA0005237
FACILITY_NAME
N A GOTELLI TRUCKING INC
STREET_NUMBER
1649
Direction
E
STREET_NAME
CHANNEL
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15304021
CURRENT_STATUS
02
SITE_LOCATION
1649 E CHANNEL ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` S <br /> 1649 East Channel Street' ( f <br /> 1 Stockton CA 95205 <br /> Chronology <br /> Tank History <br /> Tank ID Contents Installed Parte <br /> 1045-1 Diesel 8,000 gal , 10/ /88 <br /> 1045-2 Diesel 10,000 gal! 10/7/88 <br /> 1045-3 Gasoline 1,000 gal J 7/12/90 I <br /> 1988 <br /> 10/7/88 Two underground storage tanks were rem o ved, an 8,000 gal and a 10,000 <br /> gal. Soil contamination was evidenced (see Table 1). <br /> i <br /> c S <br /> 1989 <br /> 1/27/89 Approximately 350 cubic yards was excavated and soil samples were a <br /> collected to confirm that the soil contamination was removed (see Table 2). <br /> The excavated soil was transported under manifest to BF Waste Systems, <br /> I. Vasco Road Landfill in Livermore. <br /> 1990 <br /> 7/12/90 One underground storage tank was removed, a 1 ,000 gal. Soil i <br /> contamination was evidenced (see Table 3). <br /> 1992 <br /> 10/9/92 One soil boring was drilled through the former tank pit, 81 , evidencing soil <br /> contamination to 50 feet below ground surface (see Table 4). <br /> 1993 <br /> 3/9/93 Three monitoring wells were drilled and installed (see Table 5). Quarteriy <br /> sampling was initiated (see Table 6 and Table 7). <br /> i <br /> 8/30/93 Soil excavation of contamination was initiated. Soil was excavated to 30 <br /> feet and approximately 1,000 cubic yards was removed (see Table 8). <br /> 9/21/93 Soil excavation was continued to approximately 39 feet and approximately <br /> 200 cubic yards was removed (see Table 8). The contaminated soil was <br /> transported to B&J Landfill in Vacaville CA. <br />. � l <br /> 1994 F <br /> 8/9/94 The site was presented to the TRC for closure. Closure was not ` <br /> I` <br /> recommended until some deficiencies in the reporting was corrected. <br /> 1995 i ! <br /> 2/7/94 Reviewed the Revised Closure Summary Report. Prepared chronology <br /> recommending site closure. PHS/EHD has evalaluated the site for closure <br /> r, } <br /> and has found that all necessary remedial action have been implement and <br /> no further action is required. <br /> i <br /> f <br /> 11 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.