My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHANNEL
>
1649
>
3500 - Local Oversight Program
>
PR0544207
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 2:23:42 PM
Creation date
3/1/2019 1:47:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544207
PE
3528
FACILITY_ID
FA0005237
FACILITY_NAME
N A GOTELLI TRUCKING INC
STREET_NUMBER
1649
Direction
E
STREET_NAME
CHANNEL
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15304021
CURRENT_STATUS
02
SITE_LOCATION
1649 E CHANNEL ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> 1 <br /> f ADDENDUM TO CLOSURE SUMMARY REPORT <br /> MId-Cal Leasing ! <br /> t 1649 East Channel Street <br /> k Stockton, California' ', <br /> Figure 3 shows the extent of the excavation in the area the former diesel underground <br /> storage tanks (UST's) excavation and tank removal and excavation sample locations. 1 <br /> Details of the diesel tank removal and excavation are discussed.in sections.2..1 and 2.2 of <br />! the closure summary report (CSR): Analytical results for;the samples collected during <br /> the diesel tank removal are summarized on Table 1. No contamination was detected in <br /> the seven samples collected after excavation. The final excavation in the area of the <br /> former gasoline UST, the location of the tank removal samples and the location of <br /> boring B-1; installed in October 1992, is also shown on Figure 3. The gasoline UST <br /> removal is discussed in section 2.3 of the CSR. Sample results are included on Table 2. <br /> The installation of boring B-1 is discussed in section 3.2 of the CSR. The analytical } <br /> results are summarized on Table 3. <br /> Figure 4-shows the extent of the first phase of excavation including step-down ramps, <br /> excavation sample locations and stockpile Iocations. Figure 5-shows the extent of the <br /> final excavation with step-down area, stockpile locations, ,and sample locations for both <br /> the excavation and overburden soil stockpiles. Excavation procedures are discussed in ! <br /> section 3.5 of the CSR. Analytical results of excavation samples are summarized on <br /> Table 6. � <br /> j <br /> I ' <br /> j <br /> I <br /> ! <br /> i r <br /> ;i <br /> i I <br /> I <br />' k <br /> I � <br /> I <br /> } <br />
The URL can be used to link to this page
Your browser does not support the video tag.