My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001497
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHANNEL
>
1649
>
3500 - Local Oversight Program
>
PR0544207
>
ARCHIVED REPORTS XR0001497
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 2:37:09 PM
Creation date
3/1/2019 1:59:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001497
RECORD_ID
PR0544207
PE
3528
FACILITY_ID
FA0005237
FACILITY_NAME
N A GOTELLI TRUCKING INC
STREET_NUMBER
1649
Direction
E
STREET_NAME
CHANNEL
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15304021
CURRENT_STATUS
02
SITE_LOCATION
1649 E CHANNEL ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> TABLE OF CONTENTS <br /> Page <br />' 1.0 INTRODUCTION 1 <br />' 2.0 REMOVAL OF UNDERGROUND STORAGE TANKS 1 <br /> 21 Tank Removal, October 1988 1 <br /> 22 Excavation and Disposal of Hydrocarbon Impacted Soil 1 <br /> 23 Tank Removal, July 1990 3 <br /> 3.0 SITE ASSESSMENT 3 <br /> 3 1 Depth to Groundwater 3 <br /> 32 Initial Assessment and Drilling, October 1992 4 <br /> I <br /> 33 Monitoring Well Installation and Sampling, March 1993 4 <br /> 34 Quarterly Groundwater Monitoring 5 <br /> 3 4 1 Groundwater Sampling, June 1993 5 <br /> 3 4 2 Groundwater Sampling, October 1993 6 <br /> 3 4 3 Groundwater Sampling, January 1994 6 <br /> 3 4 4 Groundwater Sampling, April 1994 6 <br /> 3 4 5 Groundwater Sampling, September 1994 6 <br /> 3 4 6 Purge Water Disposition 8 <br /> 35 Excavation Activities 8 <br /> 3 5 1 Phase I Excavation, August 30 - 31, 1993 9 <br /> 3 5 2 Phase II Excavation, September 21, 1993 9 <br /> 3 5 3 Collection of Soil Samples from Clean Stockpiled Soil, <br /> I October 1993 9 <br /> 3 5 4 Collection and Disposal of Contaminated Stockpiled <br /> Soil, October 1993 9 <br /> 40 SITE CLOSURE 11 <br /> 41 Y P Hydrocarbon Impacted Soil 11 <br /> 42 Groundwater 11 <br /> 43 Site Closure 11 <br /> 5.0 LIMITATIONS 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.