Laserfiche WebLink
1 <br /> 1 <br /> TABLE OF CONTENTS <br /> Page <br />' 1.0 INTRODUCTION 1 <br />' 2.0 REMOVAL OF UNDERGROUND STORAGE TANKS 1 <br /> 21 Tank Removal, October 1988 1 <br /> 22 Excavation and Disposal of Hydrocarbon Impacted Soil 1 <br /> 23 Tank Removal, July 1990 3 <br /> 3.0 SITE ASSESSMENT 3 <br /> 3 1 Depth to Groundwater 3 <br /> 32 Initial Assessment and Drilling, October 1992 4 <br /> I <br /> 33 Monitoring Well Installation and Sampling, March 1993 4 <br /> 34 Quarterly Groundwater Monitoring 5 <br /> 3 4 1 Groundwater Sampling, June 1993 5 <br /> 3 4 2 Groundwater Sampling, October 1993 6 <br /> 3 4 3 Groundwater Sampling, January 1994 6 <br /> 3 4 4 Groundwater Sampling, April 1994 6 <br /> 3 4 5 Groundwater Sampling, September 1994 6 <br /> 3 4 6 Purge Water Disposition 8 <br /> 35 Excavation Activities 8 <br /> 3 5 1 Phase I Excavation, August 30 - 31, 1993 9 <br /> 3 5 2 Phase II Excavation, September 21, 1993 9 <br /> 3 5 3 Collection of Soil Samples from Clean Stockpiled Soil, <br /> I October 1993 9 <br /> 3 5 4 Collection and Disposal of Contaminated Stockpiled <br /> Soil, October 1993 9 <br /> 40 SITE CLOSURE 11 <br /> 41 Y P Hydrocarbon Impacted Soil 11 <br /> 42 Groundwater 11 <br /> 43 Site Closure 11 <br /> 5.0 LIMITATIONS 12 <br />