Laserfiche WebLink
I <br /> I <br /> TABLE OF CONTENTS <br />' Page <br /> 1.0 INTRODUCTION 1 <br /> 2.0 REMOVAL OF UNDERGROUND STORAGE TANKS 1 <br />' 21 Tank Removal, October 1988 1 <br /> 2 2 Excavation and Disposal of Hydrocarbon Impacted Soil 1 <br /> I23 Tank Removal, July 1990 5 <br /> 3.0 SITE ASSESSMENT 5 <br /> 31 Depth to Groundwater 5 <br /> 32 Initial Assessment and Drilling, October 1992 5 <br /> 33 Monitoring Well Installation and Sampling, March 1993 5 <br /> 34 Quarterly Groundwater Monitoring 6 <br /> 3 4 1 Groundwater Sampling, June 1993 7 <br /> 3 4 2 Groundwater Sampling, October 1993 7 <br /> 3 4 3 Groundwater Sampling, January 1994 7 <br /> 3 4 4 Groundwater Sampling, April 1994 8 <br /> 3 4 5 Purge Water Disposition 9 <br /> 35 Excavation Activities 9 <br /> - 3 5 1 Phase I Excavation, August 30 - 31, 1993 9 -_ <br /> 3 5 2 Phase II Excavation, September 21, 1993 9 <br /> 3 5 3 Collection of Soil Samples from Clean Stockpiled Soil, <br /> October 1993 11 <br /> 3 5.4 Collection and Disposal of Contaminated Stockpiled <br /> Soil, October 1993 11 <br /> 4.0 SITE CLOSURE 11 <br /> 41 Hydrocarbon Impacted Soil 11 <br /> I <br /> 42 Groundwater 12 <br /> 43 Site Closure 12 <br />' 5.0 LIMITATIONS 13 <br /> f <br />