Laserfiche WebLink
II 1 I <br />II I <br />ii�•..�w_ -� »��T-Y--=��-- —<��- _-- _-----�.-1:.�.� �. � - _--�---n- -� �e-ter �.���„ .„^s --�.- - �»._�.�'II � - w�.�,..�. <br />' s <br />I � <br />TABLE 2 <br />ANALYTICAL RESULTS FOR BORINGS B-1, B-2 & B-3 (MW -1, MW -2.& MW -3), <br />,March 9 and 10, 1993 <br />(mg/kg) <br />Sample ID <br />TPH as Gas <br />Benzene <br />Toluene <br />Ethyl - <br />-benzene <br />Xylene " <br />t ', B1-40 `_ <br />- ND <br />., u -ND <br />ND <br />ND <br />ND, <br />B1-50 <br />ND <br />ND <br />ND <br />ND <br />ND <br />B2-35 <br />ND <br />ND <br />ND <br />ND <br />ND <br />B2-45 <br />ND <br />00079 <br />ND <br />ND <br />ND <br />B2-50 <br />ND <br />ND <br />ND <br />ND'' <br />ND' <br />B3-40 ! F <br />ND <br />-ND <br />ND <br />ND <br />ND <br />B3-50 <br />ND <br />ND <br />ND <br />ND' <br />ND <br />ND = Not detected <br />On March 17, 1993, the water level in each well was measured, the wells were purged, and <br />water samples were collected Hhstoncal groundwater elevations for the momtonng,wells are �I <br />presented as Table 3 The gradient direction was determined to be 0 0073 ft/ft directed S <br />70 W Benzene and xylene were detected in MW -2 at 3 7 µg/L and 1 1 µg/L, respectively A <br />summary of all analytical results for groundwater samples is presented as Table 4 <br />2.6 Quarterly Groundwater Monitoring, June 1993 <br />The second sampling event occurred on June 24, 1993 The water level in each well was k <br />' measured, each well was purged and samples collected Between March 1993 and June 1993 <br />i I water levels rose approximately 2 to 2 1/2 feet in all wells (see Table 7) The gradient <br />direction for the June sampling event was determined to be 0 0025 ft/ft directed S 700 E <br />i' The gradient for June 1993 was more shallow than the previous gradient of 0 0073 ft/ft <br />(March 1993)'and directed 77° farther towards the east No petroleum hydrocarbons were <br />detected in any of, the samples (Table 7) <br />2.7 Excavation Activities <br />p <br />iEl I <br />i' The contaminated soil was excavated from the UST site in two phases because of space ' <br />limitations and equipment capabilities The first phase of excavation was performed on <br />August 30 and 31, 1993 The second phase of excavation was performed on September 21, <br />i 1993 After each phase of digging, soil samples were collected from the floor and sidewalls <br />of the excavation The excavator and operator were provided by Ned Pepper, Inc of <br />1 f <br />G—I.alnI Auld Se— [er � 5 <br />1 6IJ4=C.1 4R , <br />I } <br />