Laserfiche WebLink
} <br /> TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION 1 <br /> 2.0 PROJECT BACKGROUND 1 <br /> 21 Land Use 1 <br /> 2 2 Tank Removal, October 1988 1 <br /> 2 3 Depth to Groundwater 1 <br /> 2 4 Initial Assessment and Drilling, <br /> October 1992 4 <br /> 2 5 Monitoring Well Installation and Sampling, <br /> March 1993 4 <br /> 2 6 Quarterly Groundwater Monitoring, <br /> June 1993 5 <br /> 2 7 Excavation Activities 5 <br /> 2 71 Phase I Excavation, August 30 - 31, 1993 7 <br /> 2 7 2 Phase II Excavation, September 21, 1993 7 <br /> 2 7 3 Collection of Soil Samples from Clean <br /> Stockpiled Soil, October 1993 7 <br /> 2 7 4 Collection and Disposal of Contaminated <br /> Stockpiled Soil, October 3993 7 <br /> 2 8 Quarterly Groundwater Monitoring, October 1993 11 <br /> 3.0 GROUNDWATER MONITORING, JANUARY 1994 11 <br /> l <br /> 3 1 Well Monitoring and Sampling 11 <br /> 3 2 Water Sample Analysis 13 <br /> 4.0 FINDINGS 13 <br /> 4 1 Groundwater Elevation 13 <br /> 4 2 Groundwater Flow Direction and Gradient 13 <br /> 4 3 Groundwater Sample Analysis 13 <br /> 5.0 CONCLUSIONS & RECOMMENDATIONS 13 <br /> 6.0 LIMITATIONS 15 <br />.k <br /> p.alnpal wale x...m.[x <br /> i.a►R-wraai aR <br />