Laserfiche WebLink
TABLE 2 <br /> ANALYTICAL RESULTS FOR BORINGS B-1, B-2 AND B-3 <br /> March 9 and 10, 1993 <br /> mg/kg <br /> Ethyl- <br /> Sample ID TPH as Gas Benzene Toluene benzene Xylene <br /> B1-40 ND ND ND ND ND <br /> B1-50 ND ND ND ND ND <br /> B2-35 ND ND ND ND ND <br /> B2-45 ND 00079 ND ND ND <br /> B2-50 ND ND ND ND ND <br /> B3-40 ND ND ND ND ND <br /> B3-50 ND ND ND ND ND <br /> mgljcg= parts per million pm <br /> ND =Not detected <br /> On March 17, 1993, the water level in each well was measured, the wells were purged, and <br /> water samples were collected Historical groundwater elevations for the monitoring wells are <br /> presented as Table 3 The gradient direction was determined to be 0 0073 ft/ft directed S <br /> 7°W Benzene and xylene were detected in MW-2 at 3 7µg/L and 11 µg/L, respectively A <br /> summary of all analytical results for groundwater samples is presented as Table 4 <br /> 2.6 Quarterly Groundwater Monitoring, June 1993 <br /> The second sampling event occurred on June 24, 1993 The water level in each well was <br /> measured, each well was purged and samples collected Comparing March 1993 and June <br /> 1993 measurements indicates that water levels have risen approximately 2 to 2 1/2 feet in <br /> all wells (Table 3) The gradient direction for the June sampling event was determined to <br /> be 0 0025 ft/ft directed S 70°E The gradient for June, 1993 is shallower than the previous <br /> gradient of 0 0073 ft/ft [March 931 and directed 77° farther towards the east No petroleum <br /> hydrocarbons were detected in any of the samples (Table 4) <br /> 2.7 Excavation Activities <br /> The contaminated soil was excavated from the UST site in two phases because of space <br /> limitations and equipment capabilities The first phase of excavation was performed on <br /> August 30 and 31, 1993 The second phase of excavation was performed on September 21, <br /> 1993 After each phase of digging, soil samples were collected from the floor and sidewalls <br /> of the excavation The excavator and operator were provided by Ned Pepper, Inc of <br /> 0—IDPW w-&s<�,rte. 5 <br /> 160 9VMd-a�QR <br />