My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DARCY
>
701
>
2800 - Aboveground Petroleum Storage Program
>
PR0537925
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2019 4:39:20 PM
Creation date
3/1/2019 2:32:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0537925
PE
2832
FACILITY_ID
FA0015755
FACILITY_NAME
Antonini Enterprises LLC
STREET_NUMBER
701
STREET_NAME
DARCY
STREET_TYPE
PKWY
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
701 DARCY PKWY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l` <br /> 1, f �' da Te t 416 2"d Street Phone . (209) 744-0112 <br /> Galt, Ca 95632 Fax : (209) 744-0116 <br /> afforda@softeom.net <br /> VR- 401 /402 <br /> ENVIRONMENTW§tAC Pressure Performance Test Report Form <br /> DEPARTMENT <br /> Permit Number: N-4737 RDistrict: <br /> : AFFORDA TEST <br /> Site Name : ANTONINI ENTERPRISES ANE NIMMO <br /> Site Address: 701 D'Arcy PARKWAY cation Number Expiration Date <br /> City: LATHROP, CA Zip : 95330PCD <br /> Date/Time of Test: 3/13/2019 <br /> TEST INFORMATION <br /> Total number of nozzles : 1 1 Are the tanks manifolded? ❑ Yes ® No <br /> Phase I vapor recovery system executive order (as referenced on Permit to Operate) VR 401/402 <br /> Phase I vapor recovery system configuration N 2-point <br /> Phase 11 vapor recovery system executive order (as referenced on Permit to Operate) &7M2 <br /> Nitrogen introduction point ® Phase I vapor coupler ❑ Phase I vent line ❑ Phase II vapor riser <br /> Pressure measuring device ❑ incline manometer ® digital manometer ❑ mechanical gauge <br /> Calibration date for pressure measuring device (must be within 90 days of the test) 1/13/2019 <br /> Ending value for digital manometer drift test if applicable (must be 0 . 01 in. w. c. or less) . 00 <br /> Nitrogen introduction flow rate, F (must be between 1 and 5 CFM) 2 C F M <br /> Number of hoses with over 100 ml (balance hoses must be drained prior to testing) 0 <br /> TANK INFORMATION <br /> Tank No. 1 2 3 4 ALL <br /> Product grade 87 <br /> Actual tank capacity (gallons) 1 ,003 <br /> Gasoline volume (gallons) 579 <br /> Ullage (gallons) ' 424 <br /> If tanks are not manifolded, number of nozzles 1 <br /> 2 IN. W. C. STATIC PRESSURE TEST <br /> Test No . 1 2 3 4 5 <br /> Start time 1025 <br /> Initial Pressure, inches of water column (in. w. c.) 2 . 00 <br /> Pressure at one minute, in. w.c. 1 . 98 <br /> Pressure at two minutes, in. w. c. 1 . 96 <br /> Pressure at three minutes, in. w.c . 1 . 94 <br /> Pressure at four minutes, in. w.c. 1 . 92 <br /> Pressure at five minutes, in. w.c. 1 . 91 <br /> Allowable minimum pressure, in. w. c . 1 . 18 <br /> Pass / Fail PASS <br /> NOTE : 'The minimum ullage during the test shall be 25 percent of the tank capacity or 300 gallons, whichever is greater. <br /> I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed <br /> after reasonable inquiry, the statements and information provided in this document are true, accurate, and complete. <br /> Signature of Technician : Date : 3/13/2019 <br /> Ver. 1 .2 — 08 . 05 . 08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.