Laserfiche WebLink
From:Cesar Ruvalcaba [EH] [mailto:cruvalcaba@sjcehd.com] <br /> Sent: Friday, February 15,2019 12:06 PM <br /> To:Jeremiah Forest<jwfomst@antoniniusa.com<mailto:jwForest@antoniniusa.com>> <br /> Subject: RE:APSA/SPCC inspection report-287 N Cardinal Ave-PR0536495 <br /> I will deactivate the Cardinal Ave facility then. <br /> As for the Lathrop facility,as long as the engineer certifies the new tank through the SPCC plan and it meets the <br /> requirements of secondary containment as well as any other requirements under regulations,you can make the decision <br /> that best suits your business needs. <br /> FREE classes presented by NES Inc. are available to all San Joaquin County Hazardous Waste, Underground Storage <br /> Tank,and Aboveground Petroleum Storage Facility Business Owners and Operators. List and schedule of classes can be <br /> found here<https://uridefense.proofpoint.com/v2/url?u=https- <br /> 3A_webapp.sjcphs.org_EHTraining_TrainingClasses.aspx&d=DwIF- <br /> g&c=8F Fi Czt4kgO MTwQG_FkG_2u6CO987wi0psO h Uz EkX4M&r=yzmv6 N eRZGtbyUv Dgcd2o KTV IwAfu4gCeCbgZHIO D I&m <br /> =sD BZGDM Frx65CMydwpYQ2mzpizM IE W5_e1SD8Yca3BM&s=04TObiKxmArVl FEBJto D7ghygcidCZpD_837bO62o-k&e=>. <br /> Thank you, <br /> Cesar Ruvalcaba <br /> San Joaquin County Environmental Health Department<https://www.sjgov.org/department/envhealth/default> <br /> Environmental Health Specialist <br /> 1868 East Hazelton Ave <br /> Stockton,CA 95205 <br /> • (209) 953-6213 • 7(209)464-0138 • •cruvalcaba@sjcehd.com<mailto:cruvalcaba@sjcehd.com> <br /> <imageOOI.pngxhttps://www.sjgov.org/> <br /> From:Jeremiah Forest<jwForest@antoniniusa.com<mailto:jwForest@antoniniusa.com>> <br /> Sent: Friday, February 15,2019 11:55 AM <br /> To: Cesar Ruvalcaba [EH]<cruvalcaba@sjcehd.com<mailto:cruvalcaba@sjcehd.com>> <br /> Subject: RE:APSA/SPCC inspection report-287 N Cardinal Ave-PR0536495 <br /> Yes sir I can certify that all is complete.Also with the Lathrop facility we have the new spcc complete just waiting for <br /> verification from the engineer. We are currently only waiting on quote from contractor for secondary contaiinment wall <br /> for generator.The owner of the company wanted me to ask you also instead of building a retainer wall could we replace <br /> the current tank with an outside double walled tank and pipe it in like we did the diesel to eliminate the need for <br /> retainer wall? <br /> From:Cesar Ruvalcaba [EH] [mailto:cruvalcaba@sjcehd.com] <br /> Sent: Friday, February 15,2019 11:51 AM <br /> To:Jeremiah Forest<jwfomst@antoniniusa.com<mailto:jwForest@antoniniusa.com>> <br /> Subject: RE:APSA/SPCC inspection report-287 N Cardinal Ave-PR0536495 <br /> Jeremiah, <br /> Can you certify that the tank on Cardinal Ave meets the following criteria <br /> -remove all liquid and sludge from each container and connecting line <br /> -disconnect and blank offall connecting lines and piping have from the tank <br /> -close and lock all valves <br /> 2 <br />