Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for Antonini Enterprises LLC as of August 27, 2019. <br /> Open violations from October 22, 2018 inspection <br /> Violation#301 -Failed to amend Plan as necessary. <br /> The designated person accountable for discharge prevention has changed and has not been updated in the SPCC <br /> plan. The Spill Prevention, Control, and Countermeasure(SPCC) Plan must be amended when there is a change in <br /> the facility design, construction, operation, or maintenance that materially affects its potential for a discharge, within <br /> 6 months of the change, and implemented as soon as possible, not later than 6 months following preparation of the <br /> amendment. Immediately make all necessary amendments to the SPCC Plan to accurately represent the <br /> procedures and policies currently in place at the facility. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#302-Failed to review Plan once every five years and/or implement any resulting amendments. <br /> The Spill Prevention, Control, and Countermeasure(SPCC) Plan was last reviewed on October 14, 2013. A review <br /> and evaluation of the SPCC Plan must be conducted at least once every 5 years. As a result of this review and <br /> evaluation,the SPCC Plan must be amended within 6 months of review, and recertified by a Professional Engineer <br /> if any technical amendments were made. Immediately conduct a review of the facility SPCC Plan and make any <br /> necessary amendments. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#601 -Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> The Spill Prevention, Control, and Countermeasure(SPCC) Plan does not follow the order or requirements in 40 <br /> CFR Part 112, and a cross-reference was not provided. If you do not follow the sequence specified in 40 CFR 112 <br /> for the Plan, you must prepare an equivalent Plan and supplement it with a section cross-referencing the location of <br /> requirements in 40 CFR 112 and the equivalent Plan. Immediately amend the SPCC Plan to include a <br /> cross-reference or to follow the required sequence. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 1 of 4 <br />