Laserfiche WebLink
Cesar Ruvalcaba [EH] <br /> From: Jeremiah Forest <jwforest@antoniniusa.com> <br /> Sent: Friday, February 15, 2019 12:11 PM <br /> To: Cesar Ruvalcaba [EH] <br /> Subject: RE: APSA/SPCC inspection report - 287 N Cardinal Ave - PR0536495 <br /> Awesome I will call the engineer and see which way to go that will be the most effective and can be done the soonest. <br /> Thanks Cesar <br /> From: Cesar Ruvalcaba [EH] [mailto:cruvalcaba@sjcehd.com] <br /> Sent: Friday, February 15, 2019 12:06 PM <br /> To:Jeremiah Forest<jwforest@antoniniusa.com> <br /> Subject: RE:APSA/SPCC inspection report-287 N Cardinal Ave - PR0536495 <br /> I will deactivate the Cardinal Ave facility then. <br /> As for the Lathrop facility, as long as the engineer certifies the new tank through the SPCC plan and it meets the <br /> requirements of secondary containment as well as any other requirements under regulations,you can make the decision <br /> that best suits your business needs. <br /> FREE classes presented by NES Inc. are available to all San Joaquin County Hazardous Waste, Underground Storage Tank, <br /> and Aboveground Petroleum Storage Facility Business Owners and Operators. List and schedule of classes can be found <br /> here. <br /> Thank you, <br /> Cesar Ruvalcaba <br /> San Joaquin County Environmental Health Department <br /> Environmental Health Specialist <br /> 1868 East Hazelton Ave <br /> Stockton, CA 95205 <br /> 2 (209) 953-62131 A (209) 464-01381 9 cruvalcaba@sicehd.com W <br /> SAN JOAQUIN <br /> COUNTY <br /> *c Greutnass grow$ herr, <br /> From:Jeremiah Forest<jwforest@antoniniusa.com> <br /> Sent: Friday, February 15, 2019 11:55 AM <br /> To: Cesar Ruvalcaba [EH] <cruvalcaba@sicehd.com> <br /> Subject: RE:APSA/SPCC inspection report-287 N Cardinal Ave - PR0536495 <br /> Yes sir I can certify that all is complete. Also with the Lathrop facility we have the new spcc complete just waiting for <br /> verification from the engineer. We are currently only waiting on quote from contractor for secondary contaiinment wall <br /> for generator.The owner of the company wanted me to ask you also instead of building a retainer wall could we replace <br /> the current tank with an outside double walled tank and pipe it in like we did the diesel to eliminate the need for <br /> retainer wall? <br /> i <br />