Stantec <br /> Site History and Previous Investigations <br /> Stockton Charter Way Commingled Plume No. CP0057 <br /> November 15, 2011 <br /> An SVE system began operation at the Site in August 1995. These activities are summarized in <br /> the SECOR Soil Vapor Extraction System Installation and Start-up dated September 12, 1996. <br /> Between January 1996 and March 1998, the SVE system removed approximately 6,250 lbs of <br /> TPHg. The SVE system was shut down on March 9, 1998, due to declining influent <br /> concentrations and rising groundwater. <br /> In June 1999, K.E. Curtis Construction Company removed one 12,000-gallon diesel UST, three <br /> 10,000-gallon gasoline USTs, four dispenser pumps, and their associated piping. <br /> Approximately 701 tons of soil and pea gravel were excavated during UST removal activities. In <br /> addition, Cambria performed a well survey and identified one water supply well and three <br /> municipal wells located greater than 2,000 ft to the south and north of the property. <br /> In August 1999, an additional 159 tons of soil beneath the UST, piping, and dispensers was <br /> further over-excavated. These activities are summarized in the Cambria Underground Storage <br /> Tank Removal Report dated October 22, 1999. <br /> In October 2011, Stantec oversaw the restoration of groundwater monitoring wells SMW-20- <br /> 83.5 and SMW-23. Stantec also oversaw the well destruction of SMW-7, SMW-18-80, and <br /> SMW-18-120. These activities are summarized in the Stantec Well Restoration and Well <br /> Destruction Report dated November 14, 2011. <br /> Stockton Charter Way Site History and Previous Investigations.doc 9 <br />