My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
440
>
2900 - Site Mitigation Program
>
PR0536618
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 3:37:18 PM
Creation date
3/1/2019 3:03:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0536618
PE
2960
FACILITY_ID
FA0021026
FACILITY_NAME
STOCKTON CHARTER WAY COMMON PLUME
STREET_NUMBER
440
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY TOUR REPORT <br /> 10, <br /> WDC <br /> Job#: Locatiow., F, I.; RI #. Date:. <br /> From To Total Description of Ac"ex <br /> 1Z <br /> n. :,C) <br /> 1,P <br /> Materials Equipment Service Records Explanation of Standby <br /> Record materials provided by WDC Record at and of shlift,at the end of each week <br /> Item Unit Quantity Desc. Sam Intm Unit# Last4iolifir His/Miles <br /> Gravel Pack Sand Sac*JFoot I Truck Enpine FIV/011 200 hr <br /> Transition Sand Sack:/Foot hn A.11's 10,000 mile <br /> Bentonite Pellets Sucket Foot Deck Engine Fkr/Chl 200 fir ".Sr <br /> Portland Content SackfFoot Drilling Statistics <br /> Asphalt Patch Sack 1 Rg Tend" 10,000 mile Hole# From TO Total <br /> laenhunt,Chips SackfFoot <br /> V01clay,Grout Sack Fool Crew Truck 7,500 mile <br /> Concrete Sack Forklift 250 hr <br /> Rapid Set Concrete Sack <br /> Compressor FROM 200 fir <br /> Centralizers Each Shaker 250 hr <br /> End Cap Each Mud Pump 250 hr <br /> Slip Cap Each Generator 250 hr comments <br /> Looking Plug Each Walter 100 hr <br /> Monument Each FrenaWshr 100 fir <br /> Flush Cover Each <br /> Sample Liners Each List Additional Materials or Sluvillehe Provided'byWIX <br /> Drum Each Item Quantity <br /> Vjzquftn Rail <br /> Per Diem Person Day <br /> Respirator Upgrade Yes/No Total Rig <br /> Hours Worked: <br /> casing Type Schedule Diameter Fast Client Rep <br /> Blank PVC MS SS HOPE 5 10 40 80 Client Job#: I A, <br /> Blank PVC MS SS HOPE 5 10 40 80 Operator. <br /> Screen PVC MS SS HOPE 5 10 40 80 Helper 1: <br /> ellfier 2: <br />
The URL can be used to link to this page
Your browser does not support the video tag.