My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
440
>
2900 - Site Mitigation Program
>
PR0536618
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 3:37:18 PM
Creation date
3/1/2019 3:03:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0536618
PE
2960
FACILITY_ID
FA0021026
FACILITY_NAME
STOCKTON CHARTER WAY COMMON PLUME
STREET_NUMBER
440
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY TOUR REPORT <br /> WDC <br /> JobM /Ili"! l'; Location: X, 7 <br /> - A, 0:-. <br /> From TO Total Date: ./c% :o <br /> e <br /> :2 ol'it7 7t1 c f 7'e, <br /> .f f. NXI, <br /> Matadi" <br /> Record Equipollent Sellae Records Explanation of Standby <br /> occi msfi)11al8Pr0VkladbyWDC Record at and Of shift,at the end of each",k <br /> Item Unit Quantity Dose. Servfntrvl unitig L'stse" HrwMjj.a <br /> Gravel Pack Sand Sack/Foot Tritc,Engine Fltr/Ojj 200 hr <br /> Transition Sand SackuPoot <br /> has A m#,, 10.000 mile <br /> Bentonite Pallets BuckeVFmt Deck Engine Fllr/011 200 in <br /> Portland Cement Sack/Foot <br /> Asphalt Patch Sack Rig Tender 10,000 mile Drilling statistic, <br /> Bentonite Chips SackJFWI Hole# From To Total <br /> Volclay Grout SBCWFwt Crew Trucke.1 <br /> 7,500 mile <br /> Concrete Sack Forklift 250 hr <br /> Rapid Set Concrete Sack <br /> Compressor FlIn011 200 hr <br /> Centralizers Each Shaker 250 hr <br /> End Cap Each Mud Pump 250 he <br /> Slip Cap Each Generator 250 hr <br /> Looking Plug Each Welder100 hr Comments <br /> Monument Each Press Wshr ICO lar <br /> Flush Cmw Each <br /> Sample Lina Each Ust Additional Mstiarlaft or S01vic"Provided by WDC <br /> Drums Each <br /> Mzqueen Ron Item Quantity <br /> Per Dim Person Day <br /> Respirator Upgrade Yes/No <br /> Total Rig <br /> Hours Worked: <br /> Casing Type schedule Diameter Feet Client <br /> Blank PVC MS SS HOPE 5 10 40 80 <br /> Blank PVC MS SS HOPE 5 10 40 So Client Job#: <br /> Operator. <br /> Screen <br /> PVC MIS SS HOPE 5 10 40 80 <br /> Heier 1: <br /> Helper 2: /k/ <br /> attic FORM 9255 K Iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.