Laserfiche WebLink
%afftc <br /> Well Destruction Work Plan <br /> Stockton Charter Way Commingled Plume <br /> August 12, 2011 <br /> 5.0 SCHEDULE <br /> Stantec is prepared to implement the proposed scope of work upon receipt of a written approval <br /> from SJCEHD. The schedule for the proposed scope of work is as follows. <br /> • Well permitting —three weeks <br /> • Well destruction —three to four weeks <br /> • Reporting —three weeks <br /> Stockton Charter Way Commingled Plume Well Destruction Work Plan.doc 6 <br />