My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
440
>
2900 - Site Mitigation Program
>
PR0536618
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 3:43:34 PM
Creation date
3/1/2019 3:06:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536618
PE
2960
FACILITY_ID
FA0021026
FACILITY_NAME
STOCKTON CHARTER WAY COMMON PLUME
STREET_NUMBER
440
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rantec <br /> Well Destruction Work Plan <br /> Stockton Charter Way Commingled Plume <br /> August 12, 2011 <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION AND SITE BACKGROUND.................................................................... 1 <br /> 1.1 Site Background........................................................................................................... 1 <br /> 2.0 PROPOSED SCOPE OF WORK........................................................................................ 2 <br /> 2.1 Basis of Proposing an Alternative Well Destruction Methodology................................. 2 <br /> 2.2 Proposed Alternative Well Destruction Methodology.................................................... 3 <br /> 3.0 WELL DESTRUCTION....................................................................................................... 3 <br /> 3.1 Site-Specific Health and Safety Plan............................................................................ 3 <br /> 3.2 Permitting..................................................................................................................... 4 <br /> 3.3 Preliminary Field Activities ........................................................................................... 4 <br /> 3.4 Over-Drilling SMW-7 .................................................................................................... 4 <br /> 3.5 Pressure-Grouting SMW-18-80 and SMW-18-120 ....................................................... 4 <br /> 3.6 Waste Disposal............................................................................................................ 5 <br /> 4.0 REPORTING....................................................................................................................... 5 <br /> 5.0 SCHEDULE........................................................................................................................ 6 <br /> 6.0 LIMITATIONS..................................................................................................................... 7 <br /> List of Figures <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> List of Table <br /> Table 1 Soil Boring and Well Construction Details <br /> List of Appendices <br /> Appendix A San Joaquin County Environmental Health Department Email Dated July 7, 2011 <br /> Appendix B Site History and Previous Investigations <br /> Appendix C Boring Logs <br /> Appendix D Solinst CMT Decommissioning and Purge/Grout Adaptor Operating Instructions <br /> Stockton Charter Way Commingled Plume Well Destruction Work Plan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.