My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 4:53:08 PM
Creation date
3/1/2019 3:56:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE 2 <br /> sampling events. Chevron and Shell are hearby directed to participate in the <br /> coordinated sampling and monitoring events so that comparable data can be <br /> obtained. An effort will be made to standardize the groundwater elevation data to a <br /> known benchmark for more consistent data. <br /> Also, beginning in the third quarter of 1995, selected wells will be sampled for <br /> chlorinated hydrocarbons in addition to the gasoline constituents already being <br /> monitored. The quarterly report for this period is due at PHS/EHD by Friday, October <br /> 20, 1995. The sampling for chlorinated hydrocarbons will also be conducted during <br /> the first quarter sampling events. Selected wells will be sampled at feet below 3- ' <br /> grade using a bladder pump prior to purging. This technique will allow for a more <br /> consistent sampling throughout the area for more comparable results. Once this <br /> sample is obtained, the wells can be purged and sampled as normal for the other <br /> gasoline constituents. The Chevron and Shell stations located nearby on Charter <br /> Way are hearby directed to begin sampling for chlorinated hydrocarbons to establish <br /> baseline data. Subsequent sampling will be limited to perimeter wells unless <br /> supporting laboratory results warrant a more detailed sampling of the wells. This <br /> data will be used to evaluate the possible source of this contamination identified in <br /> the groundwater in the area. <br /> The next meeting is scheduled for 10:00 a.m., Monday, October 30, 1995, at the <br /> office of PHS/EHD. The additional data gathered by that time will be discussed so <br /> that progressive decisions/actions can be made by all parties. <br /> Donna Heran, R.E.H.S. <br /> Director of Environmental Health <br /> Liz,-- � <br /> t <br /> Diane M. Hinson, Supervising R.E.H.S. <br /> Environmental Health Division <br /> DMH/It <br /> c: CVRWQCB, Beth Thayer <br /> c: LOP files <br />
The URL can be used to link to this page
Your browser does not support the video tag.