My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 4:53:08 PM
Creation date
3/1/2019 3:56:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ARCO Products Co* <br /> ny <br /> 2000 Alameda de las Pulcas <br /> Mailing Address: Box 581 i ` T <br /> San Mateo, California 94402 l.�r'i LTH <br /> ii <br /> Telephone 415 571 2400 "'- <br /> ,' C,, -^ P1 2: 35 <br /> July 29, 1994 <br /> Ms. Donna Heran <br /> San Joaquin Co. Public Health Services <br /> Environmental Health Division <br /> P.O. Box 388 <br /> Stockton, CA 95201-0388 <br /> Re: ARCO meeting with PHS/EHD staff <br /> #io5b <br /> Dear Ms. Heran: <br /> ARCO will gladly meet with the PHS/EHD staff on August 9, 1994 at 10:00 AM <br /> as requested in your July 14, 1994 letter. However, I was disturbed to read that <br /> the PHS/EHD staff believes that the commitments which ARCO made in March <br /> of 1993 have not been met and that ARCO has failed to comply with our mutual <br /> agreements. This is simply not the case and I believe that you have been <br /> misinformed by your staff. This letter reviews action items which were agreed <br /> upon at the March 1993 meeting and work which ARCO has performed to <br /> address the action items. <br /> Resna, on behalf of ARCO, mailed on April 22, 1993 a summary of the ARCO - <br /> PHS/EHD meeting to Ms. Laurie Cotulla of the PHS/EHD and Ms. Beth Thayer <br /> of the RWQCB. On April 29, 1993 the PHS/EHD responded with a letter to <br /> ARCO which also summarized the meeting and presented action items which <br /> were to be performed. Site specific discussion of the action items follow. <br /> Fac. #2130, 7906 N. El Dorado St., Stockton <br /> PHS/EHD recommended that additional offsite wells be installed to the <br /> south and that the results of the air sparging tests be submitted. <br /> In early November of 1993, after access permission had finally been <br /> granted by Cal Trans, ARCO was able to install 2 wells south of the facility. <br /> Three sampling events have been performed on these wells since they were <br /> installed. ARCO has issued the following reports on this site since the March '93 <br /> meeting: a) quarterly status reports dated 4/14/93, 613/93,10/14193, & <br /> 2/16194, <br /> b) Air Sparge Pilot Test report dated 6/21193, <br /> c) Limited Subsurface Investigation report dated 6/30/93, <br /> d) Underground Storage Tank Removal report dated 2/16/94 <br /> e) Problem Assessment report dated 6/6/94 <br /> f) Final Remediation Plan for Soil & Groundwater dated 6/7/94. <br /> APPCJ7 25-D <br /> ARCO v,oe-m:company •a D,vre,or--.a1ipRmnr.1dcomaany (9-881 <br />
The URL can be used to link to this page
Your browser does not support the video tag.