Laserfiche WebLink
page 2, 441 Charter Way <br /> New SVE/AS wells will be completed and piped below ground to the remediation <br /> system compound. They will, however, be covered with a steel plate, surveyed for <br /> accurate location and when it is time for destruction of these wells they will be <br /> exposed to the surface and destroyed in an appropriate manner per San Joaquin <br /> County Well Standards, which will likely require access for a hollow stem auger <br /> drilling rig. <br /> If you have any questions please call Lori Duncan at (209) 468-0337. <br /> Donna Heran, REHS, Director <br /> Environmental Health Department <br /> Lori Duncan, Senior REHS Nuel C. Henderson, Jr., PG <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation Unit IV <br /> cc: James Barton, PG, CVRWQCB <br /> Vern Elarth, PG, URS <br />