My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 4:06:21 PM
Creation date
3/1/2019 3:57:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> page 2,441 W.Charter Way <br /> In the Work Plan URS proposed the surface completion with traffic rated, flush mounted <br /> well vaults of the SVE/AS wells. During a phone conversation on September 2, 2005 <br /> URS requested on behalf of the property owner that the SVE/AS wells be completed <br /> below grade, further stating that their locations would be mapped and they would be <br /> accessible for proper destruction from the surface. In the Addendum URS proposes these <br /> wells will be destroyed by pressure grouting through the remediation piping located in the <br /> common treatment system compound area. SJC/EHD does not approve this method of <br /> destruction. For proper destruction, the top of the wells must be exposed to the surface <br /> and the method appropriate for site conditions must be used, be it pressure grouting with <br /> mushroom cap or complete overdrilling. <br /> URS did not provide justification for the other changes to the Work Plan that they made in <br /> the Addendum. These changes include the installation of an additional groundwater <br /> monitoring well, an additional dual completed SVE/AS well, and the change in location of <br /> the SVE/AS network of wells. SJC/EHD cannot approve these proposed changes to the <br /> Work Plan without explanation,justification or demonstration that the effectiveness of the <br /> corrective action would not be compromised by the changes. <br /> If you have any questions please call Lori Duncan at (209) 468-0337. <br /> Donna Heran, REHS, Director <br /> Environmental Health Department / <br /> Lori Duncan, Senior REHS Nuel C. Henderson, Jr., PG <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation Unit IV <br /> cc: James Barton, PG, CVRWQCB <br /> Vern Elarth, PG, URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.