Laserfiche WebLink
. rr <br /> MONITORING WELL PURGING PROTOCOL <br /> MEASURE AND RECORD DEPTH TO WATER AND <br /> WELL TOTAL DEPTH <br /> CHECK FOR FLOATING PRODUCT <br /> YES NO <br /> MEASURE AND DOCUMENT CALCULATE PURGE VOLUME BY <br /> FLOATING PRODUCT THICKNESS USING THE FOLLOWING EQUATION <br /> P= n rzh x 7 48 x 3 <br /> DO NOT SAMPLE WELL FOR <br /> DISSOLVED CONSTITUENTS where <br /> P=calculated purge Volume (gallons) <br /> a=314 <br /> r=radius of well casing in feet <br /> h=height of water column, in feet <br /> EVACUATE WATER FROM WELL EQUAL TO <br /> THE CALCULATED PURGE VOLUME WHILE <br /> WELL EVACUATED TO PRACTICAL LIMITS <br /> MONITORING GROUNDWATER <br /> OF DRYNESS BEFORE REMOVING <br /> STABILIZATION INDICATOR PARAMETERS <br /> CALCULATED PURGE VOLUME <br /> (pH, CONDUCTIVITY,TEMPERATURE)AT <br /> INTERVALS OF ONE CASING VOLUME <br /> NO YES <br /> FINAL TWO SETS OF GROUNDWATER <br /> STABILIZATION INDICATOR PARAMETER <br /> MEASUREMENTS MEET THE FOLLOWING <br /> CRITERIA WELL RECHARGES TO A LEVEL <br /> pH = ±0 1 pH units SUFFICIENT FOR SAMPLE <br /> COND = ± 10 % COLLECTION WITHIN 24 HOURS <br /> TEMP = ± 10 OF OF EVACUATION TO DRYNESS <br /> YE5 NO YE5 NO <br /> WELL PURGING CONTINUE PURGING,EVACUATE FIELD TEST FIRST RECORD WELL <br /> CRITERIA MET, ADDITIONAL CASING VOLUME RECHARGE WATER FOR AS DRY FOR <br /> PROCEED TO OF WATER, MONITORING INDICATOR PARAMETERS, PURPOSES OF <br /> WELL SAMPLING INDICATOR PARAMETERS FOR THEN PROCEED TO WELL SAMPLING <br /> STABILITY ISAMPLING <br /> FIGURE <br /> INTERNATIONAL <br /> TECHNOLOGY MONITORING WELL PURGING PROTOCOL A-1 <br /> CORPORATION <br />