My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001262
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001262
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 5:08:47 PM
Creation date
3/1/2019 4:11:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001262
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> • Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 23 65 to 27 74 <br /> Direction of Groundwater Flow Northeast to Southeast <br /> Groundwater Gradient 0 002 to 0 004 <br /> SVE QUARTERLY OPERATION AND PERFORMANCE <br /> Equipment Inventory King, Buck& Associates MMC-5A (100-scfm) <br /> Operating Mode Catalytic <br /> SJVUAPCD Permit No N-3664-1-0 <br /> TPHG Cone at End of Period (lab) 17,000 mg/m3 <br /> Benzene Cone End of Period (lab) 34 mg/m3 <br /> Flow Rate End of Period 34 cubic feet per minute re-dilution <br /> Applied Vacuum This Period 69 inches of water <br /> HC Destroyed This Period(lab) 3,077 pounds _ <br /> Utility Usage (electrical/gas/propane) 7,126 kilowatt hours <br /> Operating Hours This Period 1,379 <br /> Percent Time Operational 65 percent <br /> Number of Auto Shutdowns 2(power failures) <br /> CURRENT SOURCE (BEFORE DILUTION) INFLUENT SUMMARY (LAB) <br /> TPHG Cone This Period 17,000 mg/m3 <br /> TPHG Cone Last Period 11,000 mg/m3 <br /> Initial TPHG Cone 55,000 mg/m3 (January 24, 1997 [following_system startup]) <br /> Benzene Cone This Period 34 mg/m3 <br /> Benzene Cone Last Period 50 mg/m3 <br /> Initial Benzene Conc 980 mg/m3(January 24, 1997[following system startup]) <br /> DISCUSSION <br /> Results of this groundwater monitoring event Indicate that levels of dissolved gasoline hydrocarbons are <br /> consistent with levels detected during previous sampling events The groundwater flow direction and <br /> gradient are consistent with previous sampling events Groundwater elevation decreased approximately <br /> 1 09 feet from the previous sampling event (May 1997) <br /> The remediation system was started up on January 24, 1997 The remediation system consists of a <br /> King, Buck and Associates MMC-5A Catalytic Oxidizer rated at 100 cubic feet per minute The <br /> remediation system is connected to vapor extraction wells VW-4 through VW-13 The system was <br /> operational for 65 percent of the time during the third quarter and extracted a total of 3,077 pounds of <br /> . TPHG A cumulative amount of 7,684 pounds of TPHG has been removed since commencing SVE <br /> SAC\N TM80"8051461 ODS-97Tcbeil 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.