My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001264
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 5:26:42 PM
Creation date
3/1/2019 4:12:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001264
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: October 04,2004 <br /> z Quarter 3d Quarter,2004 <br /> • ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 2168 <br /> Address 411 W Charter Way, Stockton_ , CA <br /> ARCO Environmental Engineer Kyle Christie <br /> Consulting Co/Contact Person URS/Vernon Elarth <br /> Consultant Project No 38466532 OL058 <br /> Primary Regulatory Agency San Joaquin County Environmental Health Department <br /> Assembly Bill 681 Status Property owned by Mr Bill Halverson <br /> WORK PERFORMED THIS QUARTER (Third 2004): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and subrmtted quarterly groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth 2004): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY (Third 2004): <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling MW-1, MW-1 B, MW-1 C, MW-2, MW-3, MW-4, MW-5, <br /> MW-6, MW-7, MW-8, MW-813, MW-8C Sampled <br /> Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present on Site No <br /> Current Remediation Techniques Natural attenuation <br /> Approximate Depth to Groundwater 21 94 to 26 45 feet below ground surface b s <br /> Groundwater Flow and Gradient Northeast to Southeast @ 0 001 to 0 005 feettfoot ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks, dilutions, holding times, <br /> LCS/LCSD results,MS/MSD results, and surrogate recoveries),the data are acceptable as reported by the laboratory <br /> with the following litmtations <br /> • The reported results for toluene in samples MW-1, MW-2, MW-6, and MW-7 should be considered estimated <br /> due to a high relative percent difference reported between the associated LCS and LCSD <br /> • The reported results for 1,2-dichloroethane (1,2-DCA) in samples MW-1C, MW-8, and MW-8B should be <br /> considered estimated due to a high relative percent difference reported between the associated LCS and LCSD <br /> • The elevated reporting limits were the result of dilutions performed by the laboratory to order to quantitate a <br /> target analyte <br /> is <br /> R MproccscV5 BP ARC0502]681Quurter]y1200413 QTR 0412163 GwMR 3Q04 dou Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.