My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001275
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 5:34:32 PM
Creation date
3/1/2019 4:17:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001275
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOIL BORING LOG Boring No MW-1B Sheet 3 of 5 <br /> Client Arco station 2168 Date 811100 _ <br /> Address 441 W Charter Way Drilling Company .Woodward Drilling Company ng type BW-81 _ <br /> Stockton CA Driller Van Leonard <br /> Set No D0013•329-1 Method Hollow Stem_ Auger hole dia <br /> g m t7-6d bgs 16",60'-90'bgs 8" <br /> L ed B Steve Fischenlch _._ _ - <br /> Sam le Blow Sample Well Depth Descriptions of Materials PIG <br /> Construe UTMC <br /> Type No Court Time Recov t Scale COLUMN and Conditions (PPM <br /> 4 1 <br /> 4 2 <br /> 4 3 <br /> 4 4 <br /> a 5 ML SILT with CLAY and fine gained SAND,blue-gray,very moist---------^- 57 <br /> 4 6 <br /> 4 7 <br /> 4 8 <br /> 4 9 <br /> -- <br /> __10 ML CLAYEY SILT,with fine grained SAND,dark gray-moist----------------------- ------ <br /> 5 1 <br /> 5 2 <br /> -------—--------------------------------------- ------------------------ ------ <br /> 5 4 <br /> 5 5 ML SANDY SILT <br /> 5 6 <br /> 5 7 <br /> 5 8 <br /> 5 9 <br /> s 01 ML SANDY SILT <br /> Field Location of Boring Comments Drilling terminated an August 1 to allow concrete to cure after <br /> conductor casing installed Drilling resumed on August 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.