My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001283
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 5:44:00 PM
Creation date
3/1/2019 4:19:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001283
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date September 18, 2000_ <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 02168 Address 441 Charter Way, Stockton, California <br /> ARCO Environmental Engineer Kyle Christie <br /> Consulting Co/Contact Person Delta Environmental Consultants, Inc /Jay R Johnson <br /> Consultant Project No D000-329-1 <br /> Primary Agency/Regulatory ID No Ron Rowe, San Joaquin County Public Health Seances <br /> WORK PERFORMED THIS QUARTER(Second 2000) <br /> 1 Performed quarterly groundwater monitoring and sampling for second quarter 2000 Groundwater <br /> samples were collected from monitoring wells MW-1 through MW-7 and submitted for laboratory <br /> analysis <br /> WORK PROPOSED FOR NEXT QUARTER (Third 2000) <br /> 1 The next sampling event is tentatively scheduled for September 2000 Groundwater samples will be <br /> collected and analyzed for total petroleum hydrocarbons as gasoline (TPHG) using U S <br /> Environmental Protection Agency (USEPA) Method 8015, for benzene, toluene, ethylbenzene, and <br /> total xylenes (BTEX) using USEPA Method 8020, and for 5 oxygenates (MTBE, ETBE, DIPS, TAME <br /> and TBA) and 1,2, DCA using USEPA Method 8260 <br /> 2 Delta will direct the drilling and installation of 2 on-site monitoring well clusters to provide vertical <br /> assessment of petroleum hydrocarbons in sod and groundwater Wells will be developed and <br /> sampled following the soil and groundwater investigation The new monitoring wells will be included in <br /> the third quarter groundwater monitoring event <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling MW-1 through MW-7= Quarterly <br /> Frequency of Groundwater Monitoring _ Quarterly <br /> Sample Date June 22, 2000 <br /> Is Free Product (FP) Present on Site No <br /> FP Recovered This Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 17 99 to 21 97 ft <br /> Direction of Groundwater Flow East <br /> Groundwater Gradient 0 0047 ft/ft <br /> •I <br /> C\aRCO\2169�QTRLY\2000�2168Qz00 DOC Delta <br /> 09/18/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.