My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001285
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 6:57:52 PM
Creation date
3/1/2019 4:20:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001285
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION - <br />IpResults of this groundwater monitoring event indicate that levels of dissolved gasoline hydrocarbons <br />remained generally consistent from the previous sampling events TPHG was below the method reporting <br />limit and BTEX concentrations decreased to 3 36 ppb, 0 616 ppb, 0 565 ppb, and 2 04 ppb, respectively, <br />in well MW -5 TPHG and BTEX concentrations also decreased in wells MW -6 and MW -7 MTBE was <br />detected in wells MW -1, MW -3, and MW -4 at concentrations of 34 4 ppb, 5 82 ppb, and 58 6 ppb, <br />respectively, using USEPA Method 8260 The groundwater flow direction (southeast to northeast) and <br />gradient are consistent with previous sampling events Groundwater elevation increased 0 05 foot in well <br />MW -1 and decreased 0 86 foot in wells MW -2 through MW -7 from the previous sampling event <br />(August 1999) <br />Access issues have delayed implementation of the additional site assessment proposed in the approved <br />September 29, 1999 Workplan The investigation was scheduled to begin on December 22, 1999 and <br />was rescheduled to begin on January 18, 2000 At present the investigation is postponed pending <br />resolution Details of the access -related issues were outlined in ARCO's letter dated January 18, 2000 <br />ATTACHMENTS <br />• Table 1 <br />• Table 2 <br />• Table 3 <br />• Figure 1 <br />• Figure 2 <br />• Figure 3 <br />• Appendix A <br />• Appendix B <br />W• Appendix C <br />Groundwater Monitoring Data <br />Groundwater Analytical Results for Oxygenates <br />Groundwater Flow Direction and Gradient <br />Site Location Map <br />Groundwater Analytical Summary (Fourth Quarter 1999) <br />Groundwater Elevation Contours (Fourth Quarter 1999) <br />Field Procedures <br />Laboratory Analysis Reports for Groundwater Samples and Chain -of -Custody <br />Records <br />Groundwater Monitoring Field Data Sheets <br />CP 1N 1CamPklData\Aichive\Arco121681Qtr1y12168Q499 DOC-9811sg 1 IT Corporation <br />03110M <br />
The URL can be used to link to this page
Your browser does not support the video tag.