My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001321
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 5:31:38 PM
Creation date
3/1/2019 4:32:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001321
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emcon <br /> 1433 North Morket Boulevard • Sac•amento California 95834-1943 • (916)928-3300 • Fax(916)928-3341 <br /> August 2,1995 <br /> Project 0805-146 03 <br /> Em IV E C') <br /> Mr Kyle Christie RE C AUG 0 4 1995 <br /> ARCO Products Company <br /> 2155 South Bascom, Suite 202 ENVIRONMENTAL HEALTH <br /> Campbell,California 95008 109RM1T48ERVIC#4 <br /> ' Re: Second Quarter 1995 Status Report for ARCO Service Station No. 2168 Located at <br /> 441 Charter Way, Stockton, California <br /> Dear Mr Christie <br /> ' At the request of ARCO Products Company (ARCO), EMCON is conducting an <br /> environmental investigation at the subject site (see Figure 1) We have prepared thus status <br /> report on the work conducted during the second quarter 1995 Work included conducting <br /> ' a supplemental subsurface investigation and groundwater monitoring. The subsurface <br /> investigation consisted of drilling one angle soil boring and instal ng two vapor extraction <br /> wells The purpose of this investigation was to further charactenze soil directly beneath <br /> and adjacent to the underground storage tanks (USTs) and to provide vapor extraction <br /> coverage in the vicinity of the USTs. Groundwater monitoring consisted of measuring <br /> depth to groundwater, collecting groundwater samples from the wells for subjective and <br /> Laboratory analyses, and calculating the groundwater gradient and direction of groundwater <br /> flow beneath the site <br /> ' BACKGROUND <br /> RESNA Industries (RESNA) of Rancho Cordova, California, observed the drilling of four soil <br /> borings (B-1 through B-4) at the site in July 1991 during a preliminary tank replacement <br /> assessment investigation Residual gasoline hydrocarbons were detected in soil samples <br /> ' collected from the bormgs. Boring locations are shown on Figure 2. The site was added to the <br /> San Joaquin County Public Health Services (SJCPHS), Environmental Health Division, pilot <br /> program on August 5, 1991 Based on information supplied by ARCO, the waste oil tank was <br /> removed on November 18, 1986. <br /> ' In April and May 1992, RESNA observed the drilling of eight additional soil borings (B-5 <br /> through B-12), installation of three groundwater monitoring wells (MW-1 through <br /> MW-3), and three vapor extraction wells (VW-1 through VW-3) Well locations are <br /> shown on Figure 2 Gasoline hydrocarbons were detected in samples collected from the <br /> � c <br /> borings Total ail and grease (TOG), halogenated volatile organic compounds {HVOCs}, <br /> and polychlormated biphenyls were not detected in the samples analyzed, however, total <br /> extractable hydrocarbons were detected During drilling on April 28, 1992, approximately <br /> iSACIN 1P1a10805kU805 L460 3BL-951pas 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.