My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012861
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0012861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 6:15:48 PM
Creation date
3/1/2019 4:44:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012861
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
° Fab '09 06 01 .- 20p <br /> P- 4 <br /> ANEW <br /> C ITY O F S T O C K T O N <br /> COMMUNITY DEVELOPMENT O MEIVT DEPARTMENT <br /> City Hall - 425 N. El Dorado Street'• Stockton, CA 95202-1997 <br /> SPECIAL INSPECTION AND TESTING AGREEMENT <br /> 3 <br /> Project Name:dC?QJJ. A %, FA%1 P. Date: <br /> ------------ <br /> Project-Address: G <br /> 13ldg. Permit No:J2EL-_155- I� <br /> To permit applicants of projects req Wring Special Inspection and/or Testing. ? <br /> i <br /> BEFORE A PERMIT CAN BE ISSUED: The owner, General Contractor,� Project. <br /> Architect/En ineer and S g pedal Inspector shall acknowledge the required special inspections, ! <br /> testing and conditiors. ` <br /> When determined b the Building Inspection <br /> Y 9 Division, a.pre-construction conference with the <br /> parties involved will be held to review the special Inspection requirements and procedures. <br /> Special inspection and testing shall meet the minimum requirements of CBC-Sect. 1701. The <br /> following'conditions are also applicable. <br /> I. Coritractor is responsible for notification to the Special Inspector or Agency regarding <br /> 'individual.Inspections for times listed on the attached Schedule and noted on the City <br /> approved plans. Adequate notice shall be proN4ded.so the Special Inspector has this to <br /> become familiar with the project and do a thorough job for all inspections. <br /> 2. Each Special Inspector shall submit his quallfiCations to the City and is subject to a <br /> personal interview for pre-qualification. Special Inspectors shall display an approved - <br /> identification badge when performing the function of a special inspector or upon request <br /> and must have a valid.ICBG Cerffication for the type of work being inspected. <br /> i <br /> t . <br /> 3. Duties and Responsibilities of the Special Inspector are: <br /> A. Observe the work for conformance with the CITY APPROVED(stamped).design . <br /> drawings and specifications and applicable workmanship provisions of the CBC. <br /> NOTE: Sh-olldrawings may be used galy as an aid to inspection. <br /> F . ; <br /> B. Bring non-conforming items-to immediate attention of the contractor and note in I <br /> daily report(Ref. Item 4). If any such itern isnot resolved in a timely manner or <br /> is about to be incorporated in the work, notify the Building inspection tbivlsiorr <br /> Immedlately by telephone{209)937-8561) or in person,and'Bye Project Engineer ' <br /> or Architect. <br /> - i <br /> Sttockto <br /> Page 1 of 3 4 <br /> 1999 � <br /> `s <br /> s . <br />
The URL can be used to link to this page
Your browser does not support the video tag.