Laserfiche WebLink
Feb 09 as '01 :21p <br /> P.s <br /> STRUCTURAL OBSERVATION AGREEMENT <br /> The owner shall employ the engineer.or architect responsible for the structural design, <br /> or another engineer or architect designated by the engineer or architect responsible for <br /> the structural design, to perform structural.observation as defined in Section 220. <br /> Observed deficiencies shalt be reported in writing.ta the owner's representative,special <br /> inspector, contractor and the building official. The structural observer shall submit to the <br /> building official a written statement that the site visits have been made and identifying <br /> any reported deficiencies which, to-the best of the structural observers knowledge, <br /> have not been resolved. <br /> Structural observations shall be provided in seismic zone 3 or 4 when one of the <br /> following conditions exists: <br /> E <br /> ( ) 1. The structure is defined in Table 16-k as-Occupancy Category 1, 11, or Iii or <br /> ( ) 2. The structure Is required to comply with Section 403,or <br /> 3. When so designated by the architect or engineer of record or <br /> 4. When such observation is specifically required by the building official. <br /> 4 <br /> G <br /> ENGINEER ORARCHITECT RESPONSIBLE FOR THE <br /> STR CTURAL 7DESI!GNP71NT OR TYPE) <br /> SAME SIGNATUR[AD <br /> OA <br /> I 3 <br /> DttIGNAT ENGINEER OR ARCHITECT TO PERFORM <br /> STRUTURAL OBSERV N-(PRINTOR TYPE) <br /> QZ f3 0 . <br /> SAME 9GMTURE V D Tib <br /> Revised 12/17/02 <br />