Laserfiche WebLink
� ENVIRONMENTAL <br /> _ HEALTH DEPARTMENT <br /> Donna K. Heran R.R.H.S. SAN�OAQUIN C <br /> OUNTY <br /> �s { Director 304 East WeberAVenue,Third Floor Unit Supervisors <br /> �_ �• Laurie A. Cotulia, R.E.1I.S. <br /> Program Manager Carl l3orgman,R.E.H.S. <br /> Stockton,California 95202-270$ Mike Huggins, R.E.H.S., R.D.I. <br /> Telephone: (209)46$-3420 Douglas w. Wilson, R.E.H.S. <br /> Fax: (209)464-013$ Margaret Lagorio,R.E.H.& <br /> Website:www-sjg0v.org/ehd/ Robert McClelion, R.E.H.S. <br /> Jeff Carruesco, R.E.H.S. <br /> FEB 2. 2 2006 <br /> KYLE. CHRISTIE <br /> ATLANTIC RICHFIELD. COMPANY ROSE V RODGERS. TRUST ETAL <br /> 6. CENTERPOINT DRIVE LPR6-161 BILL & LORRAINE HALVORSON <br /> i . LA PALMA CA 90623-1066 10040. DAVIS. ROAD. <br /> STOCKTON CA 95209 <br /> RE: Former ARCO Station#2168 <br /> 441 W. Charter Way Site Code: #1056 <br /> Stockton CA 95202 <br /> W PIAN: <br /> Addendum III <br /> D-A-TED: February 17,2006 APPRQVED: [x] <br /> PREPARED BY: URS Corporation Inc. DISAPPROVED:[ ] <br /> ADE ATE AND NECESSARY ELEMENTS F IIE WORK PLAN F&S� 25296.10(c)(3)' 1. Destruction of monitoring l � <br /> nng well MW-2. The well must be destroyed to make room <br /> 2" Installation of replacement wcll MW-2R 10-20 feet south-southwest of the origfor site construction. <br /> inal MW_2 location <br /> � NTS AND NDI•ITONS: <br /> l• MW-2 must he destroyed by overdrilling to total depth and removing backfilling with neat cement grout. MW-2 is a wing all contents of the borehole,followed by <br /> highly contaminated well and cannot be destroyed b <br /> 2- Permits for this work are already in place. <br /> 3. Fo h Y y pressure grout. <br /> rty-6g t how,notification to SJC/EHD is required prior to all site fieldwork. <br /> i <br /> Lori Duncan,Senior RENS � 'J- <br /> rLOP/Site Mitigation Unit IV Nuel C.Henderson,jr,,pG <br /> Site/ aga <br /> LOP Mi <br /> don Unit IV <br /> cc: James Barton,CVRWQCB <br /> Vernon Elarth,URS <br /> I <br /> t <br />