Laserfiche WebLink
WON�� � 3� lam F om e" L. „• 7' 3' .. T ^� P4 k`"� '� '_` �� nF N <br /> n �',-> r:.��T.,r.•' ,..� :,-s� -;k ?:`'rF,w; •, '„ �x� ..'�.?��� C.� ,.� vs�'r+ry.F�.,,��w.� ,d'_ _: �ice"�• ,.:s'.. ��,;�!=.e.. .e;'-.-.-.4a�t�+;a`+ <br /> Al <br /> Y <br /> Te:-aco Refining and Marketing Inc. <br /> April 7, 1989 <br /> -- 202/150-4150 <br /> sary) . R.SDSs must be attached to the inside back cover <br /> of this site safety plan, on an as-used basis (see <br /> - Appendin D) . <br /> -- DRILLING <br /> During the drilling operation, two persons (one designated <br /> w as "driller", and the ether as "helper") must be present at all <br /> times. The area of operation will be protected by an exclusion <br /> zone, with one access. No unauthorized personnel are to enter <br /> the exclusion zone. The Site Safety officer or the field team <br /> - leader has the authority to shut down drilling operations <br /> w whenever a hazardous situation is deemed present. <br /> ELECTRICAL EQUIPMENT <br /> All electrical equipment and power cables used in wells or <br /> structures containing petrochemical contamination mus" be <br /> explosion-proof or intrinsically safe, and equipped with a three- <br /> wire ground lead as described in National Electric Code (NEC)' <br /> Class I Division I, II groups A, B, C, and D. <br /> EMERGENCY RESPONSE <br /> In the event of an accident or emergency situ4tion, im- <br /> mediate action must be taken by the first person to recognize the <br /> event. First aid equipment is located on-site with the field <br /> personnel. Notify the Project Manager and Site Safety officer <br /> -' about the situation immediately after emergency procedures are <br /> implemented. <br /> 6 <br />