Laserfiche WebLink
-- <br /> i <br /> • ...•t.^° �'a '�a3 y.r .ti w� fir.! ,m„-4.+.i ;r � - 5' hC_ <br /> a t <br /> xa- <br />} <br /> Texaco Envlronmental Services September 12, 1991 <br /> s <br /> 02320 1700 Page A <br /> 3.5 MONITORING WELL DEVELOPMENT <br /> Subsequent to installation,the monitoring wells will be developed manually using the surge and ball " <br /> techn -iue. Approximately threa to live well vo;umes of water will be extracted from each well by this <br /> method. Thls to;hnlque Is used to remove the fines left from drfiiing,to create an even sand pack and to <br /> rehabilitate tha borehoie sides. The fines are drawn through the well screen and subsequently bailed from <br /> the well. This process is repeated until the writer Is visibly clear of fines. <br /> Subsequent to development,the wells roll.be left undisturbed until water levels reach equilibrium. <br /> Prior to groundwater monitoring and sampling,the wellheads will also be surveyed. <br /> 3.6 GROUNDWATER MONITORING <br /> Prior to samping, the monitoring wells will be gauged using an ORS Environmental Equipment <br /> INTERFACE PROBE"to determine depth to water(DTW),and to check for the presence of separate-phase <br /> hydrocarbons(SP). The DTW Information will be used to construct a potentiometric surface elevation map <br /> and to determine the hydraulic gradient. <br /> k <br /> 3.7 GROUNDWATER SAMPLING l <br /> After groundwater monitoring,the mon�oring wells will be purged of a sufficient water volume to <br /> assure a representative sample. Samples will then be collected using a TefltnR sampler cleaned with an <br /> Industrial d3tergent and dWIlled mater. The%nate;samples will be poured from tha sampler into appropriate <br /> containers, acidified when necessary,labeled and placed on ice in an Insulated container for delivery to a <br /> State of Calgomla-certHied laboratory. The samples will be accompanied by a chain-of-custody manifest <br /> and will be analyzed for TPH-G a,-id BTEX by modified EPA methods 5030/8020/5015. <br /> 3.8 SOIL AND VIATER DISPOSAL <br /> Soil cuttings generated during the course of drilling will be stored on and co .=-4 with heavy plastic <br /> sheeting pending laboratory analyses. Soli disposal will be the responsibility of the chem/generator. <br /> Wastewater generated from steam cleaning of drilling augers and from monito'* -well development <br /> and purging will be collecieJ and stared on site in Department of TransportP,tlon(DOT)-approved 55-gallon <br /> drums,pending disposal at an EPA-permitted transport,storage and disposal facii,,,or discharged under <br /> the appropriate permits. Wastewater disposal will be the responsibility of the cliont/generator. <br /> GROUNDIVATER <br /> y�oawKa�R�r �_ ._ `._.;TCCHNoLoi.Y,INC. <br />