Laserfiche WebLink
CAMBRIA <br /> i <br /> We received SJCPHS's approval letter for our March 28, 2001 Site Investigation Work Plan. <br /> This field work is scheduled for October 15, 16, and 17, 2001. Additionally, a drilling permit for <br /> this work will be submitted along with the permit fee to your office. <br /> i <br /> 1 CLOSING <br /> {, If you have any questions regarding the contents of this document, please call Joe Neely at <br /> (707) 933-2361. <br /> f i <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Geno Mammini <br /> Staff Geologist <br /> D GE <br /> W.� OOH <br /> Joe W. Neely, RG <br /> Senior Project Geologist <br /> RG 6927 No.6927 • <br /> OFC <br /> Attachments: <br /> Table 1. Additional Groundwater Analytical Data <br /> Figure 1. Site Vicinity Map <br /> Figure 2. Groundwater Contour/Chemical Concentration Map <br /> Appendix A. Blaine Tech Services, Inc. -Groundwater Monitoring Report <br /> cc: Ms. Karen Petryna,Equiva Services LLC <br /> Mr. Marty Hartzell, Central Valley Regional Water Quality Control Board <br /> Mr.John Fenner,Petrofunding, Inc. <br /> Mr. Johda Gill,Property owner <br /> 1399 2 <br />