Laserfiche WebLink
a <br /> C A M B R I A <br /> �i <br /> Cambria recommended additional site investigation work in our December 20, 2000 Site <br /> Investigation Report and subsequently prepared a Site Investigation Work Plan (dated <br /> March 28, 2001 We received an approval letter for this work plan from SJCPHS on <br /> June 26, 2001 and we are scheduling a driller for this work We will advise SJCPHS of the <br /> drilling date as soon as we get one Additionally, a drilling permit for this work will be <br /> submitted along with the permit fee to your office <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Joe Neely at <br /> (707) 933-2361 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> Geno Mammini <br /> . Staff Geologist <br /> V--D <br /> GEO/ <br /> H W �FFlC�s <br /> eoeWeely, RG <br /> Senior Project Geologist ° No 6927 ° <br /> RG 6927 <br /> OFC <br /> Attachments <br /> Table I Additional Groundwater Analytical Data <br /> Figure 1 Site Vicinity Map <br /> Figure 2 Groundwater Contour/Chemical Concentration Map <br /> Appendix A Blaine Tech Services, Inc - Groundwater Monitoring Report <br /> cc Ms Karen Petryna, Equiva Services LLC <br /> Mr Marty Hartzell, Central Valley Regional Water Quality Control Board <br /> Mr John Fenner, Petrofunding, Inc <br /> Mr Johda Gill, Property owner <br /> 1399 2 <br />