Laserfiche WebLink
11 1, -J, <br /> Groundwater Sampling Form <br /> Project Name Q40 u-S C.HAP7,TP, Wy Well No "W-ILA <br /> Project Number c1502-r4- el Well Type -91Aonrlor []Extraction Other <br /> Recorded By Ra Sampled by 6t3 Date -L it.jq5 <br /> WELL PURGING <br /> PURGEVOLUME PURGE fJETHOD <br /> Well casing diameter 06a:ler-Type <br /> 2-inch -'10 4=rnch Other Pump-Type LLtc <br /> Weil Total Depth(TD,ft below TOC) 1+9 i,S []Other <br /> De 'h to Water L R below TOC 3 G ZU PUMIP INTAKE <br /> De ;h to free Phase hydrocarbons FP ft below TOC Near lop Death(ft) <br /> Number of well volumes to be puroed Near Bottom Depth(ft) <br /> 3 El lo Other Other <br /> PURGE VOLU1:E CALCULATION Pumping Rate U cprn <br /> I3 -4 X (C: ' X 8E5 3 = L( 4 oat <br /> VVeler Colur v)Lenv'h 1:ittipl er No Vors CALCULATED PURGE VOLUME <br /> IAULTIPLIER Cesln Da[inf)nj=Gs1ID,slhnear f, czr <br /> 2=0173=03$ 4=066145=01-3 15=102 16= 1516=26 ACTUALPURG£VOLUfJE <br /> GROUNDWATER PARAh'ETER MIEASUREMENT Mle;er Type _M_y_ZcL1 Lpps_ <br /> Time/Gallonsp'i Cond Temp deg C Turbidry Color/Odor <br /> vomhcsJcn dee F NTU <br /> 1213 / `1 0 3pu3 I -7,3 4 zt,o I <br /> za 5 ! 1 O LO r <br /> / I 1 <br /> / I I <br /> Comments dunng well purge <br /> V,'eV Pumped d-y YES Pwge v,ster slorage/dtsp-sal Drummed ozsde Other TES AtA <br /> VVELL SAS iPL1NG <br /> SAh4PLING METHOD DaleMime Sampled 214t- 11-5 / 12-,-5 <br /> Ba ler-T)pe--o S Sample port 011ier n <br /> GROUNDWATER SAMPLE PARAI.;ETER MEASUREMENTS !!e'er Type <br /> DaleTme/% Recl-arge py cond Temp deg C Turbrdrty Color/Odor <br /> fuomhes/cm dea F NTU <br /> SAMPLING PROGRAI.1 <br /> Sam Ie No Conla,ner VVotumeAnalis s Preservatives Laboreto Commenis <br /> *4w-IL4 3 /4e lift, v6A TPH-- 6 1. �. g� <br /> I I <br /> QUALITY CONTROL SAMPLES <br /> Du Iicate Samples Blank Samples <br /> Onorna]Sam le No Duplicate Sam le No Tvr>e Sample No <br /> Trip <br /> Rlnsale F$ IA lD <br /> Transfer <br /> Other <br />