Laserfiche WebLink
f <br /> Groundwater Sampling Form <br /> Project Name E Xq[.0 J�JC oN Well No <br /> Project Number 3 d) Wel!Type YMondor ❑Extract,on []Other <br />• Recorded By A ,j^ <br /> Sampled by p S- Date 09 1�"1`{ <br /> WELL PURGING <br /> FPURGE VOLUME PURGE METHOD <br /> Well casing diameter ❑Bailer-Type <br /> ❑ 2-inch ❑ 4-tnch ❑Other Opump-Type G.v<.-�� <br /> Well Total Depth(rD,ft below TOC) 99 s []Other --- <br /> De h to Water L. ft below TOC 01 13' PUMP INTAKE <br /> De th to free Phase hydrocarbons FP flbelow TOC Near top Depth(ft) <br /> Number of well volumes to be pur ed Near Bottom Depth(ft) 4 4 <br /> E] 3 ❑ 10 Other -1 Other <br /> PURGE VOLUME CALCULATION Pumping Rate f. gprn <br /> C S X �,6 X oat <br /> Water Column Length Multiplier No Vols CALCULATED PURGE VOLUME <br /> MULTIPLIER(CasIng Daa inches =Gallons/linear ft) ga <br /> 2=0173=038 4=066 145=083 15=102 6=1 5 18=26 LACTUAL PURGE VOLUME <br /> GROUNDWATER PARAMETER MEASUREMENT Meter Type j1 <br /> Time/Gallons pH Cond Temp deg C Turbidity Color/Odor <br /> d F NTU <br /> 1 ) l Sr 6 r 6J w <br /> 1 o Tt; Goa o A,% <br /> 1 <br /> 140 / 0 1 PI 93' ,�`f 1 L4 D <br /> 34S' / — r 1 1 5-7 1 °1 6 J4 o o <br /> 0i 3. s <br /> / <br /> Comments during well purge <br /> Well Pumped d YES NO Purge water storageldisposal []Drummed onsde Bothe 1/1Avrrcw <br /> WELL SAMPLING <br /> SAMPLING METHOD Date/Trme Sampled 1y / 16 a u <br /> Bailer-Type [0 fe orAl,), Sample port ❑ Other <br /> GROUNDWATER SAMPLE PARAMETER MEASUREMENTS Meter Type <br /> Datelrmet%Recharge pHuoCond Temp eg C Turbiddy Color/Odor <br /> mhoslcm J don F <br /> 401a3ch / a / 1n0 G9 (NTUI <br /> t} J g TT <br /> SAMPLING PROGRAM <br /> Sample Ho I Container#Nolume I Analysis Preservatives Laborato Comments <br /> A L f�o c kToJu o ,►,L <br /> QUALITY CONTROL SAMPLES <br /> Duplicate Sam les Blank Samples <br /> On anal Sam le No Duplicate Sample No T Sam le No <br /> -TripT A^k. p <br /> Rinsate <br /> Transfer <br /> Other <br /> P 1GWMPIF0RMgNTa=X r)tiec trav, <br />