Laserfiche WebLink
s ' <br /> QUARTERLY SUMMARY REPORT <br /> Texaco Service Station <br /> 440 West Charter Way, Stockton, California <br /> San Joaquin County <br /> Second Quarter, 1994 <br /> HISTORY OF INVESTIGATIVE AND REMEDIAL ACTIONS <br /> In October 1988, two pump islands were removed and the area underneath one island <br /> was excavated In May 1989, an initial subsurface investigation consisted of the drilling <br /> of fifteen soil borings and one angle boring Eleven groundwater monitoring wells (MW-1 <br /> through MW-11) were installed into eleven of the fifteen borings A soil vapor extraction <br /> pilot test was conducted in May 1991 using monitoring wells MW-1, MW-4, and MW-5 to <br /> extract vapors Wells MW-2, MW-3, and MW-9 were used as vapor monitoring points <br /> Vapor extraction lines laid beneath the station building prior to building remodeling were <br /> also tested Four nested vapor extraction wells were installed in April 1992 A soil vapor <br /> extraction pilot test using the vapor extraction wells was conducted in June 1992 Five <br /> additional groundwater monitoring wells (MW-13 through MW-17) were installed in <br /> September 1993 An interim soil remediation work plan, application to construct, and <br /> permit to operate a soil vapor extraction and emission control system (thermal/catalytic <br /> oxidizer) was submitted in September and approved in November 1993 <br /> WORK PERFORMED DURING THIS QUARTER <br /> Quarterly groundwater monitoring and sampling was performed <br /> CHARACTERIZATION STATUS <br /> The extent of petroleum hydrocarbons in soil and groundwater has not been delineated <br /> Cominglmg hydrocarbon plumes with adjacent properties appear to exist <br /> REMEDIATION STATUS <br /> A soil vapor extraction and emission control system is being installed at the site <br /> WORK TO BE PERFORMED NEXT QUARTER <br /> Continue quarterly monitoring and sampling to record fluctuations in groundwater <br /> elevation and hydrocarbon concentrations Finish installing vapor extraction control <br /> system equipment (July) <br /> y COMPANY CONTACT Dave Heinrich (916) 361-0614 <br /> V \RAO,QSR\44OWC QSR <br />