Laserfiche WebLink
� CAMBRIA <br /> be collected from the well boring for soil description Soil samples will be collected at five-foot <br /> intervals until we near the depth of the proposed screen intervals At this point we will perform <br /> continuous soil sampling to verify the logs from the CPT borings Soil samples will be screened <br /> in the field for organic vapors using a photo-ionization detector (PID) Exploratory boring logs <br /> will be prepared for the well boring PID measurements will be recorded on the boring log The <br /> scope of work described in this work plan will be performed under the supervision of a registered <br /> geologist <br /> The wells will be completed using tato-inch diameter Schedule 40 PVC casing The screened <br /> section will be composed of 0 020-mch slotted PVC The screen intervals will be approximately <br /> ten feet long and from approximately 70 to 80 fbg, and from 110 to 120 fbg The sand pack will <br /> consist of Lonestar # 2112 sand (or equivalent) and will be placed along the entire length of the <br /> screen interval and one to two feet above the top of the well screen followed by a two-foot thick <br /> bentonite seal and cement grout to grade Actual well construction details will be based on field <br /> conditions at the time of drilling <br /> The wells will be secured with a locking cap under a traffic-rated well box A licensed surveyor <br /> will survey the wellhead relative to mean sea level The surveyor will also survey the well <br /> longitude and latitude per State of California guidelines <br /> Well Development and Sampling The newly installed wells will be develop prior to sampling <br /> After well development, Blaine Tech Services, Inc (Blaine) will sample the wells and submit the <br /> samples to a state-certified laboratory for chemical analyses <br /> Chemical Analyses Groundwater samples will be analyzed for TPHg, BTEX, seven fuel <br /> oxygenates, and lead scavengers by EPA Method 8260 <br /> Report Preparation Within 30 days of the receipt of analytical results from the laboratory, <br /> Cambria will prepare a written report which will include field procedures, laboratory results, <br /> boring logs, conclusions, and recommendations <br /> SCHEDULE <br /> Cambria is prepared to initiate this work upon approval of this work plan by SJCPHS/EHD The <br /> actual date of field work is contingent on driller availability <br /> 1399 3 <br />