Laserfiche WebLink
Mr Ronald Rowe <br /> C A M B R I A August 26, 1999 <br /> results for the groundwater depth profiling If wells are needed, we will submit a figure showing <br /> well locations and text justifying our recommended well construction <br /> Report Preparation <br /> Following the receipt of analytical results from the laboratory, Cambria will prepare a written <br /> report describing field procedures, laboratory results, and boring logs, and presenting a <br /> discussion of hydrocarbon fuel and oxygenate distribution We will also include a rose diagram <br /> illustrating groundwater flow over time and update the cross-sections previously prepared for the <br /> site if new data changes our interpretation of site hydrogeology <br /> The scope of work described in this work plan will be performed under the supervision of a <br /> registered professional geologist or engineer <br /> I <br /> SCHEDULE <br /> Cambria will implement this work plan upon receipt of written approval of this work plan by <br /> SJCPHS <br /> We appreciate this opportunity to work with you on this project Please call Joe Neely at (707) <br /> 935-4854 if you have any questions regarding this work plan <br /> Sincerely, <br /> Cambria Environmental chnology, Inc. <br /> ��RED GEO <br /> T �Qc�Co��N <br /> N Scott MacLeod, RG = 0 <br /> Principal Geologist No 5747 <br /> Attachments A—Analytic Results for Soil <br /> B—SVE System Performance Data <br /> C—Cross-Sections PCA <br /> D—Analytic Results for Groundwater <br /> E—Standard Field Procedures <br /> cc Ms Karen Petryna, Equiva Services LLC <br /> Ms Pat Anderson,Central Valley Regional Water Quality Control Board <br /> G\Stockton 620\Workplan July 1999 doe <br /> I <br /> 8 <br />