My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0004909
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
440
>
2900 - Site Mitigation Program
>
PR0536618
>
ARCHIVED REPORTS XR0004909
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 12:30:17 PM
Creation date
3/4/2019 10:22:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004909
RECORD_ID
PR0536618
PE
2960
FACILITY_ID
FA0021026
FACILITY_NAME
STOCKTON CHARTER WAY COMMON PLUME
STREET_NUMBER
440
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMBRIA <br /> 0 <br /> placed into a cooler with ice for transport to a State of California certified laboratory for <br /> analyses <br /> Chemical Analyses• Soil samples collected from the well boring will be analyzed for TPHg and <br /> BTEX by EPA Method 8260B Since fuel oxygenates and lead scavengers have not been <br /> detected in soil during previous investigations and are not primary constituents of concern for <br /> this site, we do not recommend analysis for them in the proposed investigation <br /> Report Preparation: Following the receipt of analytical results from the laboratory, Cambria will <br /> prepare a written report which will include field procedures, laboratory results, boring logs, and <br /> conclusions <br /> The scope of work described in this work plan will be performed under the supervision of a <br /> registered geologist <br /> SCHEDULE <br /> Cambria is prepared to begin field work upon approval of the work plan by SJCEHD, and receipt <br /> of the appropriate permits Cambria will notify SJCEHD of the field schedule at least 48 hours <br /> (two working days) prior to commencing field work <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Joe Neely at <br /> (707) 933-2361 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc, <br /> Scott Lew s <br /> Senior Staff Geologist <br /> Joe W Neely, RG <br /> Senior Project Geologist <br /> RG 6927 <br /> 1399 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.