Laserfiche WebLink
Work Plan for Soil and Groundwater Assessment 3 <br /> Chevron U.S.A. Products Company,508 Charter Way, Stockton, CA November 11, 1994 <br /> to field conditions, If required. Each well head will be protected by a locking cap and a traffic-rated, <br /> watertight street box set in concrete. <br /> Prior to groundwater monitoring and sampling, the monitoring wells will be developed by surging <br /> and bailing to remove fines from the well and sand pack. The wells will be developed until well <br /> water is visibly clear. <br /> Top of casing (TOC) and horizontal position of the wells will be professionally surveyed relative to an <br /> established local bench mark. <br /> TASK 4: REPORT PREPARATION <br /> Groundwater Technology will prepare a report summarizing the data collected under the scope of <br /> work detailed above. The report will document the methods and results of the work, summarize <br /> laboratory analytical results, and include appropriate maps. <br /> Please contact our West Sacramento office at 916-372-4700 if you have questions or comments <br /> about this work plan. <br /> Sincerely, <br /> Groundwater Technology, Inc. Groundwater Technology, Inc. <br /> Submitted by: Approved by: <br /> JAAON M. FEDOTA E. K. SIMONIS, R.G. <br /> S aff Geologist Senior Environmental Geologi L �. <br /> roject Manager <br /> QP <br /> Attachments C ' <br /> 1. Figures <br /> u' No.4422 <br /> N <br /> a <br /> CALIfO <br /> oOnscA.WKP(CHV-1D6) <br /> ❑❑`� GROUNDWATER <br /> ❑❑❑ <br /> TECHNOLOGY . <br />