Laserfiche WebLink
46 S ECOR 6 --- <br />Ms. Vicki McCartney <br />April 21, 2005 <br />Page 6 <br />and groundwater analytical results, chain -of -custody documentation, and findings. In <br />addition, new cross-sections will be prepared using the data gained from the past and <br />recent boring programs. <br />The addendum will discuss and present the results of the file review and will contain the <br />results of the sensitive receptor survey along with a map showing the locations of all wells <br />identified during the file reviews and the door-to-door survey. <br />If you have any questions or comments regarding the contents of this Work Plan, please <br />feel free to contact George Forsythe of SECOR at (559) 271-2650 extension 235 or Darin <br />Rouse of Chevron at (925) 842-1572. <br />Sincerely, PED GE <br />SECOR I ternational Incorporat 5� GE 1. FOR��o� <br />No. 6413 <br />' <br />Ste ha Fur al m Q <br />P 9 �jfi OQ`' George orsythe, P. . <br />Project Geologist OF CJXV\ Senior Geologist <br />GTF <br />Enclosures: <br />Figure 1 Site Location Map <br />Figure 2 Site Plan with Proposed CPT Locations <br />Attachment 1 Field and Laboratory Procedures <br />cc: Darin Rouse, Chevron Products Company, PO Box 6001, San Ramon, CA, 94583-0604 <br />Jim Barton, Regional Water Quality Control Board, 11020 Sun Center Dr., Rancho Cordova, CA, 95670 <br />N:\Files\Projects\Chevron\Retail\#9-2033\REPORTS\2005Addn'IAssessmentW orkPlan.doc <br />